NYC-WTC_000386209
Interagency memo describing a joint walkthrough for re-occupancy at 40 Rector Street.
7 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗Joint walkthrough coordination among agencies for re-occupancy at 40 [name], Oct 2001.
NYC-WTC_000407870–000407871OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
BSA- The windowsill of Rory Levy’s office has some dust. Also, on the north side, in James Chin’s office, there is a gap between the inner and outer sashes and an accumulatiOon of dust on the windowsill
8*'' Floor: .TLC- All windows on the south side have dust on the sills and the window vents. In addition, windows in the Hearing room are not properly closed and a gap exists under the lower sashes where there is accumulation of dust. Also, the ceiling diffuser in the north cubicle is covered. T*** Floor: CFB- There is dust on the window vents and sills and a ceiling diffuser is covered.
6*** Floor: OATH- In Martin Rainbow’s office, there is a scattering of dust on the floor and the carpet. Also, some documents with solid dust particles are on the window vents. The window tracks in this room and Judge Merris’ chambers are coated with dust.
5*^ Floor: TLC- There is some ceiling tiles missing in the MIS room. Also, the closet/locker door handles are coated with some dark dust.
4“" Floor: OLR- The north east perimeter windows are not properly closed. A gap exists, and the sills and vents are dusty. 3"^ Floor: OLR- Ceiling tiles are missing from some sections.
2"** Floor:CCRB- The window vents in the Complaint Response Unit are dirty.
The mechanical room on the 6 th floor was inspected and found to be in good condition. The system is fitted with cabon filters. A walkthrough of the emergency stairway showed no dust or debris. Copies of the lAQ analysis performed by ATC and reviewed by COSH indicate that asbestos fiber levels were below EPA and NYS DOL and EPA (asbestos) levels.
In conclusion, the findings indicate that the cleaning of the building was not thorough, effective and consistent.
Recommendations;
It is recommended that the building thoroughly re-cleaned by professionals using a HEPA vacuum if possible.
C: P. Damashek S.Pryce L. Fierstein
NYC-WTC_000407871
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000386209
Interagency memo describing a joint walkthrough for re-occupancy at 40 Rector Street.
7 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251610
Joint walkthrough involving multiple agencies for re-occupancy of floor at 40 Park Place.
7 shared non-person entities · 1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000454159
Memo documenting a floor-by-floor walkthrough for re-occupancy and dust observations.
7 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251634
General counsel memorandum about interagency coordination for occupancy before reopening.
4 shared non-person entities · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251612
Internal memorandum listing attendees and participating agencies for a building walkthrough.
4 shared non-person entities · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000407872
DCAS general counsel memo header with recipient lists and offices.
4 shared non-person entities · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000454504
Memo on re-occupancy walkthrough at 40 Rector Street conducted Oct 23, 2001.
4 shared non-person entities · similarity 0.949
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000178171
Legal memorandum documenting a walkthrough and discussion concerning building safety and re-occupancy procedures.
3 shared non-person entities · 1 shared topics · similarity 0.937
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237187
Memorandum from the Office of the General Counsel at DCAS addressed to various city safety and labor relations commissions regarding administrative matters.
4 shared non-person entities · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000174923
Memorandum from the Office of the General Counsel regarding safety and administrative services coordination.
4 shared non-person entities · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291217
DCAS/COI memo regarding re-occupancy; asbestos inspection context implied.
3 shared non-person entities · 1 shared topics · similarity 0.933
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000154594
Letter from a complainant regarding improper asbestos cleanup at 333 [name] and requesting reinvestigation of test results.
3 shared non-person entities · similarity 0.923
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000386209
Interagency memo describing a joint walkthrough for re-occupancy at 40 Rector Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000251610
Joint walkthrough involving multiple agencies for re-occupancy of floor at 40 Park Place.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000454159
Memo documenting a floor-by-floor walkthrough for re-occupancy and dust observations.
Similarity score 0.996 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000454504
Memo on re-occupancy walkthrough at 40 Rector Street conducted Oct 23, 2001.
Similarity score 0.959 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000237187
Memorandum from the Office of the General Counsel at DCAS addressed to various city safety and labor relations commissions regarding administrative matters.
Similarity score 0.958 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000174923
Memorandum from the Office of the General Counsel regarding safety and administrative services coordination.
Similarity score 0.957 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000386209
Interagency memo describing a joint walkthrough for re-occupancy at 40 Rector Street.
Similar indexed content
NYC-WTC_000251610
Joint walkthrough involving multiple agencies for re-occupancy of floor at 40 Park Place.
Similar indexed content
NYC-WTC_000454159
Memo documenting a floor-by-floor walkthrough for re-occupancy and dust observations.
Similar indexed content
NYC-WTC_000237187
Memorandum from the Office of the General Counsel at DCAS addressed to various city safety and labor relations commissions regarding administrative matters.
Similar indexed content
NYC-WTC_000251634
General counsel memorandum about interagency coordination for occupancy before reopening.
Similar indexed content