NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 9 pages

Bid draft and scope, Jan 2002, AMEC

Machine-extracted title · confidence 23%

Draft bid and scope-related correspondence for World Trade Center project; includes sealed bid process note.

NYC-WTC_000407361–000407369
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

DUE TO THE NATURE OF THE CLEANUP, THE TONNAGES LISTED IN #2 ABOVE MAY BE DELIVERED IN MORE THAN, OR LESS THAN, 30 DAYS OF AWARD.

SELLER RESERVES THE RIGHT, AT SELLER’S SOLE OPTION AND SUBJECT TO SELLER’S EQUIPMENT AVAILABILITY, TO DISCHARGE SCRAP STEEL ONTO BUYERS DOCK, IN THE EVENT BUYER CANNOT KEEP PACE WITH LOADOUT FROM WTC LOADING SITE. DETERMINATION TO IMPLEMENT THIS CLAUSE RESTS SOLELY WITH SELLER. IN THE EVENT BUYER CANNOT KEEP PACE WITH SHIPMENT OF SCRAP AND SELLER DETERMINES TO DISCHARGE SCRAP, BUYER AGREES TO REIMBURSE SELLER $5/GT FOR MOBILIZATION AND OFFLOADING OVER AND ABOVE PURCHASE PRICE FOR STEEL. ADDITIONALLY, BARGE DEMURRAGE CLAUSE WILL BE WAIVED SHOULD SELLER CHOOSE TO DISCHARGE BARGES.

ALL BARGES TO BE OFFLOADED WITHIN 24 HRS. OF PLACEMENT. DATE AND TIME OF PLACEMENT TO BE DETERMINED BY SECUREMENT TO BUYERS DOCK.

EACH BARGE WILL CONTAIN BETWEEN 400 AND 1800 GT. 1-4 BARGES/DAY WILL BE SHIPPED FROM THE MARINE LOADING SITES.

3. DEMURRAGE/DAMAGES IN THE EVENT BUYER DOES NOT COMPLETELY OFFLOAD BARGES WITHIN 24 HOURS, DEMMURAGE OF $500 /24 HRS. OR ANY PART THEREOF, IS PAYABLE TO NYC DDC. BUYER IS RESPONSIBLE FOR PROVIDING A “SAFE BERTH” AND THE SAFE OFFLOADING OF ALL BARGES.

4. WEIGHTS LIGHT AND HEAVY DRAFT SURVEY TO BE PERFORMED BY A MUTUALLY AGEEABLE INDEPENDENT SURVEYOR WHOSE DETERMINATION TO BE FINAL AS OUTLINED IN BID ADDENDUM # 3.

5. PRICING BUYER TO SUPPLY A FIRM PRICE PER GROSS TON.

6. PENALTY CLAUSE THERE WILL BE A $10/GT CHARGE FOR “LOSS OF CARGO CAPACITY” CAUSED BY THE FAILURE OF BUYER TO REMOVE ALL STEEL FROM BARGES THAT ARE DELIVERED TO BUYER. PRE LOADED LIGHT DRAFT WILL BE COMPARED TO OFFLOADED LIGHT DRAFT TO DETERMINE THIS WEIGHT.

7. PAYMENT

AMEC STEEL BID 010702 2 01/08/02

CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_008629511 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000407363

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000407363Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Page similarity is temporarily unavailable or this page has no indexed vector.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000188105

Document titled WTC Steel Bid Addendum #4 dated December 3, 2001, related to AMEC steel bid specifications.

Similar indexed content

NYC-WTC_000322394

Addendum for steel bid with NYC project code references.

Similar indexed content

Compare copies and versions →