Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
O
130 Liberty Street o>
»-*
Bulk Heavy Metals Results
Occupied Areas surveyed on September 261 2001 O
O
Air Plenums and Ducts surveyed January 16 to 19, 2002 ro
Elevators surveyed January 21 and 22, 2002
H*
O
Floor # Area Range of Results (ppm) •Tj !
Notes >
Cadmium Chromium Copper Lead Nickel Zinc X
Occupied area 8.37 -13.4 ro
74-82 130-234 37 -181 106-11.2 999-1297
4 Return air plenum 3.2 - 84 57 - 2070 105-1010 84-1130 164-1130 1300-8690 <0
I
Supply air ducts
Occupied area 6.32-11.9 71-78 130-234 6 32-158 10.7-12.3 1074 - 1727 o>
3 Return air plenum <0.580-114 61:7-181 105-1170 145 - 506 32-80 2320 - 4360 oo
Supply air ducts
Occupied area 6.38 - 7.98 79 -. 85 118-166 6.78 14.4 965-1045
2 Return air plenum 4.63-10.4 80 -'105 141 -1660 120-296 23-44 1400 - 2380
Supply air ducts
Occupied area
1 Return air plenum 5.20-14,1 194- 241 58-212 162-340 55-79 127-375 >
a
Supply air ducts w
»—I
Occupied area w
2
B H
Return air plenum <4.88-16.4 65-130 454 - 664 212-808 28-48 704-4560
O
Supply air ducts
O
Occupied area a
A Return air plenum 3.18-41 49 -.271 215-1390 27- 1220 7.54 - 85 468-17600
Supply air ducts
Pits 0 81 - 10 3 75-97 129-446 43 - 3050 -■8 9 ■ 36 929 - 1450
Cars 2.69 - 4 29 48-83 , 70 - 271 47-192' 15.5-19.8 987 - 1660
Elevators
Machine Rooms <1.51 -366 94-219 928 - 23700 258 - 448 51 -131 1700-33100
Shafts
o
H
K
I
NO
R
o
o
I •r'
o
o
to
§
co
’■J t
(JI
NYC-WTC_000386587
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000386587Source: NYC Law Department, mirrored locally