NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 15 pages

WTC emergency site health monitoring RFP, 2001

Machine-extracted title · confidence 50%

Chain of custody/health monitoring RFP document for WTC site, dated 10/01/01.

NYC-WTC_000386300–000386314
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

The anticipated monitoring outline is shown in Table 1. The requirements may change as new hazards are identified. The Contractor will be notified in writing of any requested changes and will be expected to prepare a revised monitoring strategy within 2 days after receipt of request. Requested Site Monitoring

Direct Reading Exposure Monitoring The following are some of the instruments that could be required by the Contractor for exposure monitoring at the WTC site. • Photo-ionization detector, (PED) • Flame-ionization detector (FID) • Combustible gas indicator (CGI) • Specific gas monitors (e.g. oxygen, caibon monoxide, hydrogen sulfide) • Real-time aerosol monitor (RAM) • Radiation detection instruments • Colorimetric indicating tubes (e.g. Draeger tubes) • Mercury vapor analyzer • Infrared analyzers (MIRAN) • Noise dosimeter • Sound level meter (SLM)

When required to support a specific task (based on Job Hazard Analyses) direct reading monitoring results (date/time, calibration information, results, and activities monitored) shall be recorded on an appropriate data sheet. Monitoring results shall be recorded initially and periodically throughout the monitoring period (e.g., every 15 minutes, when results are above background levels, when site operations or locations change, or when unexpected site conditions arise). Results of routine direct reading monitoring should be summarized and documented on the Direct Reading Monitoring Report (Figure 1 or equivalent). These reports shall be submitted to the DDC as part of the daily safety report.

Integrated Personal Air Monitoring Integrated personal air monitoring refers to the continuous collection of a sample over a period of time for subsequent analysis, usually by a laboratory. This monitoring typically involves the use of portable sampling pumps and an appropriate collection media such as filters, or adsorption tubes. Integrated monitoring can also be performed using organic vapor monitors and other passive sampling devices. c CD E 3 o o Q TO o ■c co o co Q_ co co o o o Z o 3 D. o'

O) o 6 z CITY_21MC1OO_OO65189O3 z

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000386305Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000280660

Additional pages for the WTC health monitoring and sampling RFP, city file reference.

Similar indexed content

NYC-WTC_000317719

SOW describing general site exposure monitoring for WTC demolition/repair work.

Similar indexed content

NYC-WTC_000280647

Doc header for health monitoring and sampling RFP, 10/01/01, contract file.

Similar indexed content

Compare copies and versions →