WTC Dust Cleaning, Draft 8/2/2002

Machine-extracted title · confidence 46%

Draft permit with hotline and cleanup options for WTC debris dust.

NYC-WTC_000362931–000362939
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

9. Negative pressure ventilation equipment shall be installed and operated during all cleaning activities. Equipment shall run continuously until clearance air monitoring. A minimum ofone air change every 15 minutes shall be provided. When ducting to the outside is not possible, a second negative pressure ventilation unit compatible with the primary unit may be connected in series.

10. All WTC debris shall be misted and double-bagged. Accumulation ofwater is prohibited. Water misting shall be sufficient to wet the material without water accumulations.

11. After the remo\ al ofdebris, all surfaces will be cleaned in accordance with the procedures specified in Scope A. ?\fter all surfaces have been cl eaned, a second cleaning shall be performed. This results in two fiill cleanings of all surfaces, v.i th the following exception. Water extraction cleaning of carpets and fabric covered furniture will be conducted only once. Surfaces include but are not limited to walls, floors, ceilings, ledges, trims, appliances, equipment and furnishings.

12. Residents may identify and tag certain furnishings (e.g. carpets and fabric covered furniture) for disposal rather :han cleaning. Disposal ofresidents ’ personal property shall not occur without prior written authorization by the owner.

13. Disposal ofall wastes generated during the cleaning shall be the responsibility ofthe contractor. All waste generated shall be treated as asbestos-containing material (ACM). Transportation and disposal of generated waste shall be in compliance with all applicable rules and regulations.

14. A Cleaning Checklist (to be developed by EPA) will be completed by the cleaning contractor as tasks are completed to document the progr ess of the cleaning.

15. An activity log will be maintained by the site supervisor.

16. The cleaning contractor shall notify the monitoring contractor immediately upon completion ofthe cleaning. The Monitoring Contractor will conduct a thorough visual inspection to verify the absence of visible dust accumulations. Ifdust is obseiwed, the cleaning contractor will reclean as necessary at no additional cost.

17. Air sampling shall be performed by the Monitoring Contractor after the area is free of dust accumulations as determined by the Monitoring Contractor. The residence will be recleaned and retested if the clean-up criteria of0.0009 fibers/cc (PCME measured by TEM) is not achieved or if detennined necessary by EPA. This clean-up criterion may be reevaluated and revised, if determined necessary based on field conditions and analytical limitations.

18. After successful clearance air monitoring, isolation barriers shall be removed in conjunction with the use of a HEP A vacuum.

8

CITY_21MC100_000438985 NYC-WTC_000362938

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000362938Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →