NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 1 page

Asbestos clean-up procedures memo, WTC area, Sep 2001

Machine-extracted title · confidence 48%

Guidance for cleanup of asbestos-containing materials following World Trade Center incident.

NYC-WTC_000362829
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

!

’o: Building Owners . rom: R. Radhakpshnan, P.E.

»ate: September 14, 2001

ubject: Clean-up of Asbestos-containing Material

Building owners or their representatives instituting clean-up activities of areas affected by the World Trade Center attack should follow these procedures:

1. Minimal dust accumulations (light coating) can be cleaned using wet methods and/or vacuums equipped with HEPA filters.

2. HVAC-system filters should be replaced prior to re-occupancy.

3. Accumulations of dust that include pieces of debris must be sampled by a NYC- DEP certified investigator or NYS- DOL inspector to determine whether the material is asbestos-containing material (ACM) or it may be assumed to be ACM. Wipe sampling and/or micro-vacuum sampling are not recognized methods for asbestos sampling and should not be used. Bulk sample analysis (PLM) must be performed by laboratories with ELAP accreditation.

4. Only individuals certified by the NYC-DEP as asbestos handlers can handle dust and debris accumulations identified to be ACM or asbestos-contaminated objects. ACM is any material containing more that one percent asbestos. All work shall be performed in accordance with Title 15, Chapter 1 of the Rules of the City of New York.

5. Emergency telephone notification must be provided to the Department. The telephone notification must include the name affiliation, and telephone number of the caller; the exact location including street address, floor, and surface types to be cleaned; the name, address, and telephone number of the NYS DOL licensed asbestos contractor handling the material”and the starting date. The Asbestos and Lead. Control Program (ALCP) may be reached'via (718) DEP- HELP(24hrs/7days).

6. A scope-of-work including the inforaiation outlined in number 3 above and the procedures to be employed should be faxed to the ALGP at fax number (718) 595-3744 or (718) 595-3648. The Department will review plans, provide assistance, and offer recommendations. Our staff will be available to answer your questions from 8:00 a.m. to 8:00 p.m. seven days per week. A field office has been set up to expedite on-site assistance if necessary.

7. Remote showering units shall be acceptable. The area where the installation is proposed shall be pre-cleaned using wet wiping and/or HEPA vacuuming procedures. The location of the unit shall be specified in the scope of work

CITY_21MC100_002841038

NYC-WTC_000362829

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000362829Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Clean-up of ACM, Sept 2001

NYC-WTC_000302311

Memo outlining cleanup steps for asbestos-containing material after incidents.

Similar indexed content

Clean-up of ACM memo, Sept 2001

NYC-WTC_000302310

Memo detailing asbestos-containing material cleanup procedures and sampling guidance.

Similar indexed content

Compare copies and versions →