NYC-WTC_000117536
Chain of custody documentation for bulk sampling and air monitoring at 345 South End Avenue Building 100.
10 shared non-person entities · 1 shared topics · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗Final air monitoring and bulk sampling report for PS 89M area, Oct 2001.
NYC-WTC_000361661–000361673OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
0^ Final Report of Air Monitoring and Bulk Sampling Services 4.1 Sample Collection
Air samples are collected by pulling air through a mixed cellulose ester filter (MCE), 25 millimeters (mm) in diameter, with a pore size of 0.45 micrometers for TEM analysis. A 120-volt AC powered, constant flow vacuum pump pulls the air at flow rates of 5 to 15 liters per minute. The pumps are calibrated prior to sampling, using a secondary calibration standard (rotometer). The secondary calibration standards are calibrated periodically (at least once every four months) using a primary standard (one liter bubble burette). The flow rate of each pump is rechecked following each sampling period.
4.2 Sample Analysis and Reporting
Transmission Electron Microscopy (TEM) analysis was performed by a New York State ELAP/NVLAP approved laboratory. All samples were analyzed by the TEM method in appendix A of Subpart E of 40 CFR 763. Asbestos structure concentrations are calculated by determining the number of structures coimted within an area of the filter. The result is an expression of the concentration of asbestos structure per square millimeter (s/mm^). TEM Clearance air monitoring results are considered satisfactory when the asbestos concentration of each individual samples is less than 70 s/mm\
4.3 Quality Control
Laboratory technicians involved in PCM air sample analysis have completed the NIOSH 582 Sampling and Evaluating Airborne Asbestos Debris course, or an equivalent. Technicians also participate in the NIOSH/AIHA (American Industrial Hygiene Association) Proficiency Analytical Testing (PAT) Program to ensure consistency in methodology. The laboratory maintains an in-house quality control (QC) program for PCM air samples whereby ten percent of all submitted samples are reanalyzed and documented in a QC manual. The laboratory also participates in a quarterly round robin QC program with several accredited laboratories throughout the United States.
4.4 Sample Results
Initial air monitoring indicated asbestos structure concentrations above 70 structures per millimeter square in Room 502 of the 5* Floor. Subsequent ambient air monitoring analysis results from samples taken in Room 502 indicated that the concentrations of airborne fibers within this room were less than 70 structures per millimeter square, the concentration set forth by EPA AHERA Regulations for re-occupancy of an area.
DDC Project No.: WTCEMERGE Warren & Panzer Engineers Project No. 1017.17.01 A Member of PS 89M, 201 Warren Street, Manhattan, New York The Warren & Pander ^002
CITY_21MC100_007143285
NYC-WTC_000361664
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
No available related records indexed in this group.
NYC-WTC_000117536
Chain of custody documentation for bulk sampling and air monitoring at 345 South End Avenue Building 100.
10 shared non-person entities · 1 shared topics · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000117668
Chain of custody documentation for bulk sampling and air monitoring at 385 South End Avenue Building 500.
10 shared non-person entities · 1 shared topics · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000231403
Document establishing the chain of custody for an asbestos assessment, bulk sampling, and air monitoring report at a building on Liberty Avenue.
12 shared non-person entities · 1 shared topics · similarity 0.964
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000095478
Cover page for an air monitoring and bulk sampling report for Building #200 at 375 South End Avenue.
12 shared non-person entities · 1 shared topics · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000230980
Application submitted to the DEP regarding cleaning procedures for a residential condominium, including exterior facade and interior duct work.
5 shared non-person entities · 1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000108678
Document page summarizing positive and negative counts for asbestos analysis via PLM, PCM, and TEM methods.
7 shared non-person entities · 1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000149432
DEP asbestos project notification form and inspection report dated December 12, 2002.
9 shared non-person entities · 1 shared topics · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000117493
Cover page for a report detailing annual assessment, bulk sampling, and air monitoring activities at the specified address.
12 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000112389
Invoice from an asbestos removal contractor detailing roof cleanup services performed at 45 Wall Street in September 2002.
4 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000130979
Interoffice memo forwarding bulk sample analysis and air monitoring results to the DEP Director.
4 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000098081
Laboratory report confirming less than one percent asbestos found in bulk samples at the specified premises.
3 shared non-person entities · 1 shared topics · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155920
Header page of a chain of custody document from the DEP Bureau of Air, Noise, and related services.
5 shared non-person entities · 1 shared topics · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000435590
DEP memo outlining pre-bid meeting and asbestos monitoring for WTC renovation.
Similarity score 0.977 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000435996
Chain of custody noting pre-bid walk-through at 125 Cedar Street.
Similarity score 0.977 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000452493
DEP pre-bid meeting notice and background for asbestos cleaning at WTC site.
Similarity score 0.976 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000446586
Chain-of-custody document detailing asbestos sample monitoring setup for 125 Cedar Street decontamination.
Similarity score 0.976 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000433215
DEP scope of work for 125 Cedar Street interior dust monitoring and abatement oversight.
Similarity score 0.976 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000433703
DEP/WTC project scope describing building debris, dust, and required asbestos air monitoring during cleaning.
Similarity score 0.976 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Chain of custody documentation for bulk sampling and air monitoring at 345 South End Avenue Building 100.
Similar indexed content
Chain of custody documentation for bulk sampling and air monitoring at 385 South End Avenue Building 500.
Similar indexed content
NYC-WTC_000231403
Document establishing the chain of custody for an asbestos assessment, bulk sampling, and air monitoring report at a building on Liberty Avenue.
Similar indexed content
Cover page for an air monitoring and bulk sampling report for Building #200 at 375 South End Avenue.
Similar indexed content
Application submitted to the DEP regarding cleaning procedures for a residential condominium, including exterior facade and interior duct work.
Similar indexed content