NYC 9/11 Public Portal Document
US Department ofLabor/OSHA WTC Safety Intervention
grouped by hazards, and tasks and sorted by Datefrom 01/21/2002 to 01/27/2002
Type of Task Date Time Location Sector Contributing Factor Equipment Abated ? Comments
1/26/02 8:45 PM Church St Bovis Equipment not installed / Excavator 0
used correctly
Type of Hazard: Excavation - spoils # of Hazard(s): 3
utility work # of Occurrence(s): 3
1/24/02 5:58 PM West St Bovis Debris 0
1/24/02 10:38 PM Vesey & West Bovis Debris 0
1/26/02 8:53 PM Church St Bovis Debris Other 0
Type of Hazard: Excavation - unprotected # of Hazard(s): 7
# of Occurrence(s): 0
1/23/02 7:23 PM WTC2 Amec Unsafe act □
1/26/02 6:50 AM Bovis □
1/27/02 2:53 AM WestSt Bovis no guardrails or barriers
around openings.
□ ■
1/27/02 4:58 AM West St Bovis no guardrails or barriers □ ■
around openings.
no exposure # of Occurrence(s): 1
1/21/02 1:28 AM Liberty & Greenwich Bovis. [J cones on north side only
Utility work # of Occurrence(s): 2
1/24/02 5:55 PM West St Bovis Equipment not installed / Other 0
used correctly .
1/26/02 8:50 PM Church St . Bovis Equipment not installed / Other 0
used con-ectly
Type of Hazard: Fall - floor opening / hole # of Hazard(s): 8
Burning - # of Occun-ence(s): 1
1/22/02 11:06 AM WTC 4 , Tully PPE - not used Torch or lance 0
cover moved. # of Occurrence(s): 1
1/24/02 8:14 AM Tully Equipment not installed / 0
Q
used correctly
I
3 Debris removal # of Occurrence(s): 2
1/22/02 11:48 PM Church St Bovis missing floor cover or 0
I'
o
1/26/02 8:52 PM Church St Bovis
barriers around the opening
Equipment unattended Other 0
o Driving # of Occurrence(s): 2
I
o
o
CO
Tuesday, January 29, 2002 Page 3 0/22
CO
CO
cn
NYC-WTC_000360700
OCR can misread numbers and units. Confirm readings against the page image before using them.