NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 92 pages

NIST/CS compliance document for security systems

Machine-extracted title · confidence 25%

Sanitation dept. form referencing NIST guide and security standards for NYC systems.

NYC-WTC_000360278–000360369
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Appendix D Glossary Backup: A copy of files and programs made to facilitate recovery if necessary.

Business Continuity Plan (BCP): The documentation of a predetermined set of instructions or procedures that describe how an organization’s business functions will be sustained during and after a significant disruption.

Business Impact Analysis (BIA): An analysis of an IT system’s requirements, processes, and interdependencies used to characterize system contingency requirements and priorities in the event of a significant disruption.

Business Recovery/Resumption Plan (BRP): The documentation of a predetermined set of instructions or procedures that describe how business processes will be restored after a significant disruption has occurred.

Cold Site: A backup facility that has the necessary electrical and physical components of a computer facility, but does not have the computer equipment in place. The site is ready to receive the necessary replacement computer equipment in the event that the user has to move from their main computing location to an alternate site.

Computer: A device that accepts digital data and manipulates the information based on a program or sequence of instructions for how data is to be processed.

Contingency Plan: Management policy and procedures designed to maintain or restore business operations, including computer operations, possibly at an alternate location, in the event of emergencies, system failures, or disaster.

Contingency Planning: See Contingency Plan.

Continuity of Operations Plan (COOP): A predetermined set of instructions or procedures that describe how an organization’s essentialfunctions will be sustained for up to 30 days as a result of a disaster event before returning to normal operations.

Continuity of Support Plan: The documentation of a predetermined set of instructions or procedures mandated by 0MB A-130 that describe how to sustain major applications and general support systems in the event of a significant disruption.

Disaster Recovery Plan (DRP): A written plan for processing critical applications in the event of a major hardware or software failure or destruction of facilities.

D-1

NYC-WTC_000360357

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000360357Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000279102

Building Department memo/guide related to emergency planning after 9/11.

Similar indexed content

NYC-WTC_000165900 · Box 7DDC

Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.

Similar indexed content

Compare copies and versions →