NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 92 pages

NIST/CS compliance document for security systems

Machine-extracted title · confidence 25%

Sanitation dept. form referencing NIST guide and security standards for NYC systems.

NYC-WTC_000360278–000360369
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

■ A valid contract exists with the Alternate site that designates that site in City, State, as the /Orsanization name} ’s alternate operating facility. - /Organization name} will use the Alternate site building and information technology resources to recover {system name} functionality during an emergency situation that prevents access to the originalfacility. - The designated computer system at the Alternate site has been configured to begin processing {system name} information. - The Alternate site will be used to continue {system name} recovery and processing throughout the period of disruption, until the return to normal operations.

1.2.2 Assumptions Based on these principles, the following assumptions were used when developing the IT Contingency Plan—

■ The {system name} is inoperable at the /Orsanization name} computer center and cannot be recovered within 48 hours. ■ Key {system name} personnel have been identified and trained in their emergency response and recovery roles; they are available to activate the {system name} Contingency Plan. ■ Preventive controls (e.g., generators, environmental controls, waterproof tarps, sprinkler systems, fire extinguishers, and fire department assistance) are fully operational at the time of the disaster. ■ Computer center equipment, including components supporting {system name}, are connected to an uninterruptible power supply (UPS) that provides 45 minutes to 1 hour of electricity during a power failure. ■ {system name} hardware and software at the /Orsanization name} orisinal site are imavailable for at least 48 hours. ■ Current backups of the application software and data are intact and available at the Offsite storage facility. ■ The equipment, connections, and capabilities required to operate {system name} are available at the Alternate site in City, State. ■ Service agreements are maintained with {system name} hardware, software, and communications providers to support the emergency system recovery.

The Isystem name} Contingency Plan does not apply to the following situations:

■ Overall recovery and continuity of business operations. The Business Resumption Plan and Continuity of Operations Plan (COOP) are appended to the plan.

A-2

NYC-WTC_000360285

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000360285Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000279102

Building Department memo/guide related to emergency planning after 9/11.

Similar indexed content

NYC-WTC_000165900 · Box 7DDC

Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.

Similar indexed content

Compare copies and versions →