NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 92 pages

NIST/CS compliance document for security systems

Machine-extracted title · confidence 25%

Sanitation dept. form referencing NIST guide and security standards for NYC systems.

NYC-WTC_000360278–000360369
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

through implementation of security controls to protect a system against natural, human, and technological threats. Risk management also should encompass actions to reduce or limit the consequences of threats in the event that they successfully disrupt a system. These measures form the basis for contingency planning because the measures are developed in anticipation of a possible event and then executed after that event has occurred. 4. Into what phase of the System Development Life Cycle (SDLC) should Contingency Planning be incorporated? Although contingency planning is associated with activities occurring in the operation/maintenance phase, contingency measures should be identified and integrated into ALL phases of the SDLC. Incorporating contingency planning into the SDLC reduces overall contingency planning costs, enhances contingency capabilities, and reduces impacts to system operations when the contingency plan is implemented. 5. What is the first step I need to take before writing an IT Contingency Plan?

The first step in the contingency planning process is to develop a Contingency Planning Policy supported by senior management. This policy should define the agency’s overall contingency objectives and should establish the organizational framework and responsibilities for IT contingency planning. The policy statement should also address roles and responsibilities. The policy should be supported with procedures covering training requirements, frequency of backups, offsite storage shipments, plan exercises, testing, and maintenance. 6. How can I determine which contingency solutions I should implement to ensure availability of my IT systems? The BIA, which is the second step in the Contingency Planning process, is central to determining what recovery strategies should be implemented to ensure availability. The BIA enables the Contingency Planning Coordinator to characterize fully the system requirements, processes, and interdependencies to determine contingency requirements and priorities. The BIA should be developed with input from all associated system owners, end users, and internal and external interconnected system partners. Critical resources for accomplishing the IT system’s mission(s) should be identified through data calls with these points of contact. Possible impacts attributed to the unavailability of these resources over time and across associated systems and processes can then be determined, leading to sequencing the recovery of the resources based on potential impacts. Thus, the resource requirements and recovery prioritization will form the basis for developing appropriate contingency solutions. 7. What type of alternate site should I choose as a recovery strategy? The type of alternate site should be determined through the BIA. The alternate site choice must be cost effective and match the availability needs of the organization’s IT systems. Thus, if a system requires 100 percent availability, then a Hot Site might be the right choice. However, if the system can allow a day of downtime, then possibly a Cold Site might be a better option.

C-2

NYC-WTC_000360354

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000360354Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000279102

Building Department memo/guide related to emergency planning after 9/11.

Similar indexed content

NYC-WTC_000165900 · Box 7DDC

Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.

Similar indexed content

Compare copies and versions →