NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 92 pages

NIST/CS compliance document for security systems

Machine-extracted title · confidence 25%

Sanitation dept. form referencing NIST guide and security standards for NYC systems.

NYC-WTC_000360278–000360369
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

4. IT Contingency Plan Development This section discusses the key elements that comprise the contingency plan. As described in Section 3, contingency plan development is a critical step in the process of establishing a comprehensive contingency planning program. The plan contains detailed roles, responsibilities, teams, and procedures associated with restoring an IT system following a disruption. The contingency plan should document technical capabilities designed to support contingency operations. The contingency plan should be tailored to the organization and its requirements. Plans need to balance detail with flexibility; usually the more detailed the plan is, the less scalable and versatile the approach. The information presented here is meant to be a guide; however, the plan format in this document may be modified as needed to better meet the user’s specific system, operational, and organization requirements. Appendix A provides a template that organizations may use to develop contingency plans for their respective systems.

As shown in Figure 4-1, this planning guide identifies five main components of the contingency plan. The Supporting Information and Appendices components provide essential data to ensure a comprehensive plan. The Notification/Activation, Recoveiy, and Reconstitution Phases address specific actions that the organization should take following a system disruption or emergency. Each plan component is discussed later in this section. Supporting Information •-Introduction------------------ • Concept of Operations

Notification/Activation Phase • Notification procedures Plan Development • Damage assessment ■ Plan activation

Recovery Phase • Incorporate BIA findings • Sequence of recovery activities • Document • Recovery procedures recovery strategy Reconstitution Phase • Restore original site • Test systems • Terminate operations

Plan Appendices • POC lists -j-SystemrecjutreRieRts— ! • SOPs i • Vital records

Figure 4-1. Contingency Plan Structure

Plans should be formatted to provide quick and clear direction in the event personnel unfamiliar with the plan or the systems are performing recovery operations. Plans should be clear, concise, and easy to implement in an emergency. Where possible, checklists and step-by-step procedures should be used. A concise and well-formatted plan reduces the likelihood of creating an overly complex or confusing plan.

28

NYC-WTC_000360318

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000360318Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000279102

Building Department memo/guide related to emergency planning after 9/11.

Similar indexed content

NYC-WTC_000165900 · Box 7DDC

Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.

Similar indexed content

Compare copies and versions →