NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 92 pages

NIST/CS compliance document for security systems

Machine-extracted title · confidence 25%

Sanitation dept. form referencing NIST guide and security standards for NYC systems.

NYC-WTC_000360278–000360369
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Table of Contents

1. Introduction 1 1.1 Authority.................. 1 1.2 Purpose...................... 2 1.3 Scope.......................... 2 1.4 Audience.................... 4 1.5 Document Structure 4 2. Background.... 6 2.1 Contingency Planning and Risk Management Process......... ..6 2.2 Types of Plans........................................................................... ,.8 2.3 Contingency Planning and System Development Life Cycle 11 3. IT Contingency Planning Process 14 3.1 Develop Contingency Planning Policy.......................... 14 3.2 Conduct Business Impact Analysis................................. 16 3.2.2 Identifi' Critical IT Resources......................................... 16 3.2.2 Identify Disruption Impacts and Allowable Outage Times. 17 3.2.3 Develop Recovery Priorities........................................... 17 3.3 Identify Preventive Controls......................................... n 3.4 Develop Recovery Strategies......................................... 18 3.4.1 Backup Methods.............. 18 3.4.2 Alternate Sites................. 19 3.4.3 Equipment Replacement.... 21 3.4.4 Roles and Responsibilities. 22 3.4.5 Cost Considerations........ 24 3.5 Plan Testing, Training, and Exercises, 24 3.6 Plan Maintenance................................ 25 4. IT Contingency Plan Development 28 4.1 Supporting Information.......... 29 4.2 Notification/Activation Phase 30 4.2.1 Notification Procedures 30 4.2.2 Damage Assessment..... 32 4.2.3 Plan Activation............ 33 4.3 Recovery Phase............................... 33 4.3.1 Sequence ofRecovery Activities 34 4.3.2 Recovery Procedures................ 34 4.4 Reconstitution Phase...................... 35 4.5 Plan Appendices................................ 36 5. Technical Contingency Planning Considera tions 37 5.1 Desktop Computers and Portable Systems , 37 5.1.1 Contingency Considerations................. 38 5.1.2 Contingency Solutions.......................... 39 5.2 Servers.......................................................... 42 5.2.1 Contingency Considerations................. 42 5.2.2 Contingency Solutions............................... 42 5.3 Web Sites....................... ................................ 49 5.3.1 Contingency Considerations................. 49 5.3.2 Contingency Solutions.......................... 51 5.4 Local Area Networks................................... 51

iii

NYC-WTC_000360293

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000360293Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000279102

Building Department memo/guide related to emergency planning after 9/11.

Similar indexed content

NYC-WTC_000165900 · Box 7DDC

Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.

Similar indexed content

Compare copies and versions →