NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 92 pages

NIST/CS compliance document for security systems

Machine-extracted title · confidence 25%

Sanitation dept. form referencing NIST guide and security standards for NYC systems.

NYC-WTC_000360278–000360369
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

2.2 Responsibilities The following teams have been developed and trained to respond to a contingency event affecting the IT system. The Contingency Plan establishes several teams assigned to participate in recovering {system namel operations. The {team name) is responsible for recovery of the {system name} computer environment and all applications. Members of the team name include personnel who are also responsible for the daily operations and maintenance of {system name}. The team leader title directs the {team name}.

Continue to describe each team, their responsibilities, leadership, and coordination with other applicable teams during a recovery operation.

The relationships of the team leaders involved in system recovery and their member teams are illustrated in Figure XX below.

(Insert hierarchical diagram of recovery teams. Show team names and leaders; do not include actual names ofpersonnel.)

Describe each team separately, highlighting overall recovery goals and specific responsibilities. Do not detail the procedures that will be used to execute these responsibilities. These procedures will be itemized in the appropriate phase sections.

3 NOTIFICATION AND ACTIVATION PHASE This phase addresses the initial actions taken to detect and assess damage inflicted by a disruption to Isystem name). Based on the assessment of the event, the plan may be activated by the Contingency Planning Coordinator. In an emergency, the {Organization namePs top priority is to preserve the health and safety of its staff before proceeding to the Notification and Activation procedures. Contact information for key personnel is located in Appendix A. The notification sequence is listed below:

■ The first responder is to notify the Contingency Planning Coordinator. All known information must be relayed to the Contingency Planning Coordinator. ■ The systems manager is to contact the Damage Assessment Team Leader and inform them of the event. The Contingency Planning Coordinator is to instruct the Team Leader to begin assessment procedures. ■ The Damage Assessment Team Leader is to notify team members and direct them to complete the assessment procedures outlined below to determine the extent of damage and estimated recovery time. If damage assessment cannot be performed locally because of unsafe conditions, the Damage Assessment Team is to follow the outline below.

A-5

NYC-WTC_000360288

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000360288Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000279102

Building Department memo/guide related to emergency planning after 9/11.

Similar indexed content

NYC-WTC_000165900 · Box 7DDC

Document page containing contact details for Con Edison and JWC Environmental Health & Safety personnel.

Similar indexed content

Compare copies and versions →