DDC mold remediation walk-through at World Trade Center Building 5; July 2002 correspondence.

NYC-WTC_000358608–000358611
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

7

City of New York Department of Design and Construction Kenneth Holden Commissioner

Mark A. Canu WTC MOLD REMEDIATION WALK-THROUGH Assistant Commissioner Technical Support Building 5, Basement Level 4 30-30 Thomson Avenue Long Island City, NY 11101 www.nyc.gov/buildnyc

To: Bruce Rottner Prepare Date: July 26, 2002 Director of Site Safety From: Loan Dinh Incident Date: July 25, 2002 Site Safety Auditor CAPIS ID: WTCEMERGE Address: Ground Zero, WTC Building 5 Vesey St. & Church St., NY

INTRODUCTION

Ms. Loan Dinh, DDC Site Safety Auditor, was dispatched to the World Trade Center (WTC) with Bovis Lend Lease (BLL), ATC Associates Inc. (ATC) and Safeway on Thursday, July 25, 2002 at 11:00 am. Ms. Dinh met with Mr. Ray Master, Director of Health and Safety for BLL, Mr. Mike Donovan, ATC Project Manager, and Safeway Project Manager and Superintendent at the WTC for a final mold remediation walk-through. BLL is the construction management for this project with Safeway, as the sub-contractor. ATC was retained by DDC as the consultant for this project.

The project at the WTC building 5, level 4 (the “site”) consisted of abatement and removal of mold and mold-contaminated materials from the site. The mold remediation project has been complete by Safeway approximately one week prior to the date of the walk-through. Other than the removal of water from the collection pit by Moretrench, there were no other activities observed at the time of the walk-through. DDC understands that mold samples were collected by ATC through surface wipe and air monitor methods during the course of the project. During the site walk-through, ATC conducted visual inspection and collected a total of seven wipe samples.

FINDINGS

On Thursday, July 25, 2002, at approximately 1:30 pm, Ms. Dinh conducted a visual inspection of the site along with BLL, ATC, and Safeway. DDC gained access into the site from basement level 2 parking garage areas. The site consists of one large rectangular room with several smaller rooms. The rooms were observed to be bare with the exception of concrete block walls and brick-surface columns. Piping was observed throughout the ceiling including small amounts of pipe insulation (fiberglass) and light fixtures. Office partitions, floorings, ceiling covers, and mechanical equipment

Telephone; 718-391-1198 Environmental, Health and Salety Services Unit Fax: 718-391-1499 Fifth Floor

CITY_21MC100_011914929

NYC-WTC_000358608

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000358608Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →