NYC-WTC_000278495
Lab report presenting core weights and calculated gravity.
1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗Lab report for bulk specific gravity of compacted mixture cores from WTC paving (May 2002).
NYC-WTC_000342409–000342411OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
MUNICIPAL TESTING LABORATORY, INC. 102 NEW SOUTH ROAD, HICKSVILLE NEW YORK, 11801 (516) 938-7120;FAX (516) 938-5107 www.municipaltestinglab.com emaii: municipal @municipaltestinglab.com ■L SERVICE LABORATORY AND ENGINEERING CONSULTANT; STEEL, CONCRETE, SOILS, ASPHALT & ALL BUILDING MATERIALS
LABORATORY REPORT CLIENT: LIRO____________ DATE-PLACED: 05/03/02 PROJECT: W.T.C. Paving ■ DATE-CORED: 05/07/02 CALCULATIONS BY: M.Mathew TESTED: 05/08/02 REPORT No. 9209 SPEC: NYCDDC Page 2 of 3 BULK SPECIFIC GRAVITY OF COMPACTED MIXTURE CORES ASTM D-2726 WEIGHT - GRAMS CORE IN IN SAT-SUR. VOLUME SPECIFIC Thick- NO. AIR WATER DRY CU.CM. GRAVITY Gmb ness(in.) D E El (E1-E)=F D/F=G 1.25 9 534.3 310.0 538.8 228.8 2.335 2.00 10 889.3 536.5 889.5 353.0 2.519 2.00 11 813.2 483.2 813.5 330.3 2.462 2.00 12 862.1 510.3 862.7 352.4 2.446 2.50 13 1114.5 652.7 1115 462.3 2.411 1.50 14 674 399.4 674.6 275.2 2.449 ^2.00 15 824.8 491.3 825.2 333.9 2.470 I 3.00 16 1300.6 785.3 1301.7 516.4 2.519
PAVEMENT DENSITY CALCULATIONS CORE BULK SPEC. SPECIFIC GRAVITY PERCENT GRAVITY DESIGN MIX VALUE COMPACTION CORE ASTM D-2726 (PLANT SUPPLIED) (Gmb/Gmm) NO. Gmb Gmm xlOO 9 2.335 2.631 88.8 10 2.519 2.631 95.8 11 2.462 2.631 93.6 12 2.446 2.631 93.0 13 2.411 2.631 91.6 14 2.449 2.631 93.1 15 2.470 2.631 93.9 16 2.519 2.631 95.8
02,224256
CITY_21MC100_003007561
NYC-WTC_000342410
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000278495
Lab report presenting core weights and calculated gravity.
1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342347
Test results for MAT cores; density and gravity values recorded.
1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278426
Lab report calculating bulk specific gravity of compacted mix using CIV cores from WTC paving project.
1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342383
Core-based gravity data for PA cores from LiRo paving project.
1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356588
Laboratory batch tests (bulk specific gravity) for LIRO WTC paving project, May 2002.
1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000281750
Bulk specific gravity of LIRO mat cores, 06/15/02.
1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342389
LiRo core gravity results for SS13–SS15; ASTM D-2726.
1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342449
Laboratory report on bulk specific gravity of compacted Mat cores from W.T.C. paving project, May 2002.
1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342372
Laboratory report with multiple material cores, calculating specific gravity per ASTM D-2726.
1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278533
Laboratory report presenting bulk specific gravity measurements for compacted WTC paving mixtures.
1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000281734
Bulk specific gravity results for compacted mat cores, NYCDDC spec, 06/2002.
1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278467
Core-based bulk specific gravity results for WTC paving project.
1 shared topics · similarity 0.998
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000278495
Lab report presenting core weights and calculated gravity.
Similarity score 0.999 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342449
Laboratory report on bulk specific gravity of compacted Mat cores from W.T.C. paving project, May 2002.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290449
Bulk specific gravity results for compacted mix; W.T.C. paving; May 2002.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000342383
Core-based gravity data for PA cores from LiRo paving project.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278517
Bulk specific gravity of compacted mixture, cores, April–May 2002.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290467
Bulk specific gravity results for W.T.C. paving cores, May 2002.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000278495
Lab report presenting core weights and calculated gravity.
Similar indexed content
NYC-WTC_000342347
Test results for MAT cores; density and gravity values recorded.
Similar indexed content
NYC-WTC_000278426
Lab report calculating bulk specific gravity of compacted mix using CIV cores from WTC paving project.
Similar indexed content
NYC-WTC_000342383
Core-based gravity data for PA cores from LiRo paving project.
Similar indexed content
NYC-WTC_000356588
Laboratory batch tests (bulk specific gravity) for LIRO WTC paving project, May 2002.
Similar indexed content