NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 44 pages

OSHA Part 56 asbestos regulations text

Machine-extracted title · confidence 32%

New York DOSH Part 56 asbestos regulations and definitions.

NYC-WTC_000340368–000340411
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

NYSDOL - DOSH Regulations - Reg Page 11 of 44 emergency as defined in section 56-1.4(ad) of this Subpart (rule), the owner, owner's agent, consultant or contractor shall contact the Program Manager's Office, Asbestos Control Bureau, in Albany, New York, via telephone or in person to request permission to proceed with the asbestos project. The individual giving such notification may be asked to provide some or all of the information required of an individual giving full written notification of an asbestos project.

(b) Emergency approval.The Program Manager, Asbestos Control Bureau, or other duly authorized representative of the commissioner, upon ascertaining all pertinent facts relating to the request, shall be empowered to either allow or deny ±e request for permission to proceed with an emergency asbestos project without the filing of prior notification. Unless permission to proceed with the project under alternative conditions is granted pursuant to section 56-3.2 of this Part (rule), all work on the project shall conform to the requirements set forth in this Part (rule).

(c) Follow-up notification.If permission to proceed with the emergency asbestos project is granted, the person to whom such permission is granted shall within two working days, file the written notification required by section 56-1.6 of this Subpart (rule) with the Program Manager, Asbestos Control Bureau, Albany, New York.

Historical Note: Sec. filed July 7, 1987; repealed, new filed Oct. 18, 1991 eff. Jan. 1, 1992. § 56-1.8 Notification of residential and business occupants.

(a) Ten-day notice.

(1) Every contractor engaged in the abatement portion of a project shall post or otherwise provide for a written notification to residential and business occupants of a building 10 days prior to the commencement of work on any asbestos project in the building. With regard to projects being conducted in school buildings, the faculty, staff and students attending such school shall be considered to be business occupants and shall receive notice as required in this Part (rule).

(2) Notification-procedure-detail. The written notification shall be given to those business and residential occupants of a building, or portion thereof, who are located on the floor or floors where the actual project is to be conducted, and one floor above and one floor below the floor or floors containing the project. In addition, such written notification shall also be given to those occupants of adjacent buildings who have direct horizontal access to these floors. Posted notice shall be provided at all direct means of access to the floor, such as but not limited to, stairways, ramps, emergency ingress/egress, elevators, escalators, ladders, hallways, corridors and trapdoors.

(b) Three-day notice.If the work is scheduled to begin less than 10 days after the execution of the contract, each contractor shall post or otherwise provide written notice of any asbestos project to residential and business occupants in the building where work will be performed at least three days prior to commencement of work.

(c) Other notice.If an emergency makes it impossible to provide the notice required by subdivision (a) or (b) of this section, every contractor shall post or otherwise provide for written notification to residential and business occupants of the building, as soon as practicable after identification of the project, in the manner set forth in section 56-1.7 of this Subpart.

(d) Duration of posting.Posted notices shall remain in place until completion of the project.

(e) Content.Each notification shall include the following information:

(1) the room, location(s) or area designation of the asbestos project;

(2) the amounts and types of asbestos or asbestos material, in square feet and/or linear feet, that is being

http://www,labor.state.ny.us/html/safety/s56.htm 01/20/2001

CITY_21MC100_012156403

NYC-WTC_000340378

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000340378Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000446470

State Part 56 asbestos chain-of-custody/document referencing NY Department of Labor; NYC files.

Similar indexed content

Compare copies and versions →