Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Area [Sample #1 Sample Duration Fibers/cc Fibers/cc
Location/Task Type (mins) PCM OSHAPCM
total fiber (Obvious non
count asbestos fibers
excluded)
B2 [0929DD01] A 385 0.0170 ND
Hot Plaza Area by
WTC#5, WTC #4
being demolished
B3 [[0929TM1] A 310 0.0710 0.0150
Trinity& Church
Tully sign out Station
A3 [0929TM2] A 315 0.0320 0.0030
West & Albany
Respirator fit chk Stat
Initially dusty area
9/29 Summary
I
Zone # of Samples # of Bulks Fibers/cc
Hot I
Warm
Page 27 of 65
CITY_21MC100_007222384
NYC-WTC_000339879
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000339879Source: NYC Law Department, mirrored locally
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.