Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
9/28 WTC OSHA ASBESTOS SAMPLING DATA
Permissible Exposure Limit (PEL): 0.1 fiber/centermeter as an 8-hr time weighted average
Excursion Limit: 1 fiber/cubic centimeter over a 30-minute period
Area [Sample #1 Sample Duration Fibers/cc Fibers/cc
Location/Task Type (mins) PCM OSHAPCM
total fiber (obvious non
count asbestos fibers
excluded)
A2 [TR928-1][789231] P 280 0.0990 0.0270
On the rubble pile:
(Hot) Crane Operator
removing steel scrap &
loading onto trucks
A2 [RD928-025] P 235 over NA
Winter Garden loaded overloaded
(Hot) Iron Worker moving
steel onto trucks from
the debris pile
A2 [MH0928-1] P 60 0.190 ND
Winter Garden
(Hot) Iron Worker burning
steel/shoveling debris. 4
(Working in a dust
cloud)
A2 [MH0928-4] P 125 0.210 0.0120
Winter Garden
(Hot) Iron Worker burning
steel/shoveling debris.
(Working in a dust
cloud)
J !
Page 24 of 65
I
ji
CITY_21MC100_007222381
NYC-WTC_000339876
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000339876Source: NYC Law Department, mirrored locally
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.