Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Area f Sample #1 Sample Duration Fibers/cc Fibers/cc
Location Type (mins) Total Fiber OSHAPCM
count
fObvious non
asbestos fibers
excluded)
[M1612#13] -Tully P no 0.0550 ND
South side of WTC#2
Iron worker burning
steel beams
[M1612 #3]- Tully P 80 0.0390 ND
South Tower WTC#2 (
Laborer direct trucks
1
loading debris
[M1612 #19] - Tully P 75 0.0540 ND
South Tower WTC#2
Laborer direct trucks
loading debris I
[M1612#8] - Tully P 115 0.0260 ND
§
South Tower WTC#2
Laborer direct trucks
loading debris
[M1612 #22]- Tully P 70 0.0220 ND
South Tower WTC#2
Laborer direct trucks
loading debris
[107CGJW1] P 210 0.0660 ND
Tumer/Seasons I
WTC#7-Greenwich & I
Barclay - Excavator
Excavator s
I
I
J
Page 49 of 65
i
CITY_21MC100_007222406
NYC-WTC_000339901
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000339901Source: NYC Law Department, mirrored locally
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.