Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
9/27 WTC OSHA ASBESTOS SAMPLING DATA
Permissible exposure Limit (PEL); 0.1 fiber/cubic centimeter as an 8-hr time
weighted average
Excursion limit: 1 fiber/cubic centimeter over a 30- minute period.
Area (Sample#! Sample Duration Fibers/cc Fibers/cc
Locatioa/task Ixpe (mins) PCM total OSHA PCM
fiber count (Obvious
Don-asbestos
fibers
si
excluded)
A2 [RD927-020] p 340 0.0350 ND
i (Hot) Winter Garden
3
debris pile
Bob Cat Operator
A2 [MH0927-1] P 248 0.0350 9
(Hot) NW cor WTC#1 Ck w/lab ?
in the hole
Iron Worker I
I
I
A2 [927CG2] P 190 0.150 0.0090
(hot) WTC#1
Extractor Operator
pulling out beams
B2 [SD927-4] P 285 0.0490 ND I
(Hot) WTC #7
Grappler
B2 [SD927-3] A 200 0.0810 0.0170
(Hot) Barclay-W.Broadwy
A2 [MH0927-8] B n/a 50%
(Hot) NW cor WTC#1 chrysotile
in the hole
)
■i
Page 22 of 65
I
CITY_21MC100_007222379
NYC-WTC_OOO339874
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000339874Source: NYC Law Department, mirrored locally
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.