Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Area (Sample #1 Sample Duration Fibers/cc Fibers/cc
Location Type fining Total Fiber OSHAPCM
count
fObvious non
asbestos fibers
excluded)
[A787341] A 309 NA ND
AMEC-Mazzachi
Top of nibble pile,
Grappler (am-rain)
[A787321]-Tully A 216 0.1100 ND
South Tower- top of
I
ramp, N of rubble pile I
(light rain)
1
{
[A787351]-Tully A 103 0.0940 ND
South Tower- top of
ramp, N of rubble pile
(light rain)
[106SHl][A787674] A 211 0.0130 ND
AMEC
Op Engineer tool crib,
N side adj to pit WTCl
I
(rain in AM)
[106SH2][A787681] A 77 ND ND
AMEC -Op Engineer
1 tool crib,N side adj to
pit WTC#1 (rain in
AM)
[A789248]
Tully- South Tower
A 214 0.0320 ND
I
I
rubble pile, dirt ramp
on east side (light rain) I
Ii
{
Page 45 of 65
CITY_21MC100_007222402
NYC-WTC_000339897
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000339897Source: NYC Law Department, mirrored locally
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.