Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
i,
I
Area (Sample #1 Sample Duration Fibers/cc Fibers/cc
Location/task Type (mins) Total Fiber OSHAPCM
count
(Obvious non
asbestos fibers
excluded!
I [A787352] - Tully A 195 0.100 ND
NE comer of South
Tower, nr top of the
pile Grappler clearing
debris at the top of
path into debris pile
(sample in cab)
[A789253] - Tully A 169 0.0660 ND
NE comer of South
Tower, adj to debris
pile/ end of path into
debris pile i
[A787357] - Tully A 206 0.0410 ND
NE comer of South
Tower, adj to debris
pile/ end of path into
debris pile I
[104SH4][A787705] A 303 0.0160 ND
AMEC
At the Atrium -taped to
basket pole
10/04 SUMMARY
Zone # of Samples # of Bulks Fibers/cc
Hot
I
Warm
«i
Page 41 of 65
S
CITY_21MC100_007222398
NYC-WTC_000339893
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000339893Source: NYC Law Department, mirrored locally
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.