Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
1
Area (Sample #1 Sample Duration Fibers/cc Fibers/cc
Location/task Type (mins) Total Fiber OSHAPCM
count
fObvious non
asbestos fibers
excluded)
[A788697] P 145 0.160 ND
Tully
Bet/WTC#1 
Foreman- directing
trucks/excavators
[A788698] P 157 0.190 ND
Tully
Betw/WTC#1 
Foreman directing
trucks/excavators
[102MCO1] P 147 0.150 ND I
Tully
Betw. WTC #1 & #2
S. of plaza/E. Of
WTC2
F oreman-directing
traffic
[102MCO2] p 156 0.170 ND
Tully
Foreman
Betw. WTC #1 
S. of plaza/E. Of
WTC2
F oreman-directing
traffic
Page 37 of 65
CITY_21MC1OO_O07222394
NYC-WTC_000339889
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000339889Source: NYC Law Department, mirrored locally
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.