Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Area [Sample #1 Sample Duration Fiber/cc Fibers/cc
(mins) Total Fiber OSHAPCM
Location/Task Tyee count
(Obvious non
asbestos fibers
excluded)
A2 [93001 TGI] P 332 0.0370 0.0030
Hot AMEC
WTC#1 - 10'from pile
(3''^ in line)
Operating Engineer
using excavator
[93001TG2] P 231 0.0560 0.0040
Breeze
WTC #1- 5" from pile
(2"^ in line)
Operating Engineer
using excavator
[93001TG3] P 283 over overloaded
Breeze loaded
WTC#1 - on top of
pile
Operating Engineer
using excavator
[0930CG1A] P 180 0.140 0.0070 I
Operating a Grappler
i
1 [0930CG2A] P 220 0.0870 0.0070
WTC #7 -on the pile
Operating Engineer-
operating a excavator
Page 29 of 65
CITY_21MC100_007222386
NYC-WTC_000339881
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000339881Source: NYC Law Department, mirrored locally
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.
Detailed OSHA asbestos sampling log for September 26, 2001, listing fiber counts and TEM analysis results for specific tasks at the World Trade Center site.