Dust protection and demolition proposal

Machine-extracted title · confidence 41%

Proposal outlining costs for dust protection after WTC disaster demolition.

NYC-WTC_000337577–000337578
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

/

At the Amec site there will be two 4000 gallon water tracks which cost $850 each per shift. There will also be one 2000 gallon water track which costs $750 per shift and one service truck which costs $650 per week.

The water trucks will be used to pump overhead sprinkler rigs and truess rigs for wetting down trailers. All rigs will be mounted on overhead boom arms. The water trucks will also be used to do site wet downs as needed on hot and fiaming steel

The effects trailer costs $2500.00 per week. It will contain all fitting and three overhead rigs which will be rigged off the overhead crane or boom lift. This will provide 14,400 square feet ofrain coverage (120’X 120’).

Water trucks are custom built to provide adequate pressure to get water to rigs. Each 4000 gallon water truck has an auxiliary engine and pumps.

The costs for labor is as follows:

• Teamsters (3) ~ $191.22 per seven hour shift and $273.20 per five hour shift (this breaks down to $54.65 per hour on the five hour shift). The costs for the benefits is 29% which comes to 134.68 for the full twelve hour shift. The total cost per each driver is $599.10 per shift. • Effects (2) — Effects also receive $599.10 per shift. The breakdown is the same as for the drivers. • Foreman (1) - $225.00 per seven hour shift and $350.00 per five hour shift (this breaks down to $70.00 per hour on the five hour shift). The cost for their benefits is also 29% which comes to $166.75 for the full twelve hour drift. The total cost per foreman is $741.75 per shift.

The teamsters are Local S17 Teamsters and effects men and foremen are members of Local 52 lATSE. All of them are trained in the use of water tracks and overhead rigging.

Additional plans for the site in it’s entirety are available upon request.

CITY_21MC100_006753267

NYC-WTC_000337578

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000337578Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000136670

Archival folder label from the Office of the Mayor for World Trade Center records, identified as Folder 0140.

Similar indexed content

NYC-WTC_000136542

Archival folder label from the Office of the Mayor for World Trade Center records, identified as Folder 0139.

Similar indexed content

Compare copies and versions →