NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 3 pages

Asbestos monitoring contract scope, chain of custody

Machine-extracted title · confidence 44%

CoC document for asbestos air monitoring service contract scope.

NYC-WTC_000332213–000332215
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

D. Tasks Project 1

The NYC DEP shall direct services. Air monitoring and analysis firm must be prepared to mobilize within 72 hours of the contract award. The NYC DEP estimates the monitoring of roof tops and facades of approximately 50 buildings per work zone. There will be 3 work zones in the vicinity of the World Trade Center. Multiple work areas shall be cleaned and monitored simultaneously therefore a minimum of 15 APST must be available for this project. A minimum of 3 samples for small asbestos projects and a minimum of 5 samples for large projects shall be collected and analyzed. At a minimum, l-area sample on small projects and 2- area samples on large projects shall be taken inside the work area during clean-up activities. One area sample shall be taken at the interior of the building within 10 feet of each access to the roof. Sampling must be conducted during the entire work shift. The sample volumes required would range from 1200 to 1800 liters at flow rates between 2 to 10 Hters/min Extreme care must be given to avoid overload on the filter surface.

Air sampling equipment shall not be placed in comers or near obstructions. Locations near vents and other structures on the roof which would unduly affect airflow shall be avoided.

The work area shall be allowed to dry completely before the visual inspection is conducted. The visual inspection shall confirm the absence of visible debris in the work area, including but not limited to the roof surface, the gutters, the drains, parapets, etc. A technician must be available in the vicinity when the area is dry to perform the visual inspection.

Air sampling shall be considered satisfactory when each sample is found to be below 70 s/mm’ by TEM analysis. Post abatement clearance air sampling shall not be required provided that all samples collected during the clean-up activities are below 70 s/mm^

Project 2.

Air Monitoring will be required daily at 20 street level sites in the vicinity of the World Trade Center. The sites are listed below but the locations may change periodically. One sample must be collected at each site with sample duration of 45 minutes and a flow rate of 15 liters per minute . Sampling and analysis must be conducted in accordance with the NIOSH 7400 Method. Sampling must be done during regular business hours starting after 0800 hours each day. Each site must be manned at all times during sampling, therefore a minimum of 3 APST is required for this project.

Samples results above O.Olf/cc must be analyzed by TEM .

2

CITY_21MC100_003067183

NYC-WTC_000332214

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000332214Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000362773

Contract scope of work for asbestos air monitoring and analysis services with NYC DEP.

Similar indexed content

NYC-WTC_000284196

Scope of work for asbestos air monitoring and analysis service contract.

Similar indexed content

NYC-WTC_000141438 · Box DEP Box 05

Contract scope defining regulatory compliance and bidding requirements for air monitoring services at the World Trade Center site.

Similar indexed content

Compare copies and versions →