Summary of Environmental Sampling Conducted at PS 234
A. Sampling Conducted Independently by the New York City' Board of
Education
5,
Initial Asbestos Testing (October 2, 2001)
ATC performed the initial asbestos testing in and around the school on October 2, 2001.
That testing included collection of 50 dust samples and 20 ambient air samples from
inside the school, and three debris samples from the roof of the school. ATC reported
that none of the 50 dust samples contained any detectable asbestos fibers, and none of the
20 air samples contained any asbestos structures. Two of the three jdebris samples from
the roof contained traces of asbestos, at less than 1 percent.
Follow-up Testing for Asbestos (October 4-16, 2001)
Aggressive air sampling (sampling conducted with ventilation systems operating and
using a leaf blower to mobilize dust from surfaces into the air) was conducted for
asbestos on October 4, prior to the beginning of cleaning operations at the school, and
October 16, following the cleanup activities. The October 4 sampling included the
analysis of five samples from inside the school. Three of those five samples contained no
asbestos structures, while the other two samples contained 3 and 14.8 structures/mm^,
respectively, less than the AHERA clearance level of 70 structures/nfm“. The October 16
testing included the collection of eight air samples from inside the school for analysis of
asbestos. All eight of the air samples were found to contain no asbestos structures. In
addition to the air testing, four wipe samples were collected from lockers around the
school on October 14 . All four of those samples were reported to have no asbestos
detected.
Debris and Soil Sampling for Asbestos (October 30,2001)
Following a site inspection involving the Board of Education, Schoo! Construction
Authority, ENVIRON and PTA representatives, ATC performed additional testing of
debris from the roof and under the rubber padding in the playground, as well as soils
from planters located in the school yard. ENVIRON had recommended the cleanup of
the debris in all these areas based on visual observations made during an initial inspection
of the school. One sample of debris from the roof was found to contain 1.5 percent
asbestos, which is above the 1 percent limit used to define an asbestos-containing
material. Most of the other roof debris samples contained between a trace of asbestos and
0.75 percent asbestos. Based on these results, the School Construction Authority (SCA)
contracted for the removal of all the stone ballast and debris from the roof.
1