NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 64 pages

EPA background report, WTC air contaminants, 1987

Machine-extracted title · confidence 29%

Background report on asbestos and related contaminants for WTC environment, 1987.

NYC-WTC_000318755–000318818
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

i j. Federal Register f Vol. 52, No. 83 / Thursday, April 30, 1987 / Rules and Regulations 15879

?• non-disposable clothing: and regulations (2) 40 CFR Part 61, National Emission respirators and their proper selection, i' covering personal protective equipment. Standards for Hazardous Air Pollutants, inspection, donning, use,, maintenance, (g) Additional safety hazards. Subparts A (General Provisions) and M and storage procedures; methods for Hazards encountered during abatement (National Emission Standard for field testing of the facepiece-to-face seal l' activities and how to deal with them. Asbestos). (positive and negative pressure fitting including electrical hazards, heat stress, (3) OSHA standards for permissible tests); qualitative and quantitative fit air contaminants other than asbestos, exposure to airborne concentrations of testing procedures; variability between fire and explosion hazards. asbestos fibers and respiratory field and laboratory protection factors; (h) Fiber aerodynamics and control. protection (29 CFR 1910.134). factors that alter respirator fit (e.g., Aerodynamic characteristics of asbestos (4) EPA Worker Protection Rule, found facial hair); the components of a proper fibers; importance of proper at 40 CFR Part 763, Subpart G. containment barriers; settling time for (5) OSHA Asbestos Construction respiratory protection program; asbestos fibers: wet methods in Standard found at 29 CFR 1926.58. selection and use of personal protective abatement: aggressive air monitoring (s) Course Review. A review of key clothing; use, storage, and handling of following abatement: aggressive air aspects of the training course. non-disposable’clothing; and regulations movement and negative pressure D. Asbestbs^Abatement Contractors covering personal protective equipment. ' exhaust ventilation as a clean-up and Supervisors. A. State shall require (d) State-of-the-art work practices. method. that all persons seeking accreditation as Proper work practices for asbestos (i) Designing abatement solutions. asbestos abatement contractors or abatement activities including Discussions of removal, enclosure, and supervisors complete a 4-day training descriptions of proper construction and encapsulation methods; asbestos waste course as outlined below. The training maintenance of barriers and disposal. course shall include lectures, decontamination enclosure systems; (j) Budgeting/cost estimation. demonstrations, at least 6 hours of positioning of warning signs: electrical Development of cost estimates; present hands^n training, individual respirator and ventilation system lockout: proper costs of abatement versus future fit testing,, course review, and a written working techniques for minimizing fiber operations and maintenance costs; examination. EPA recommends the use release; use of wet methods; use of t setting priorities for abatement jobs to reduce cost. of audiovisual materials to complement lecture^, where appropriate. negative pressure ventilation equipment; use of high efficiency particulate air (k) Writing abatement specifications. The contractor may designate a (HEPA) vacuums; proper clean-up and . Means and methods specifications supervisor to serve as his agent for the disposal procedures. Work practices for versus performance specifications: purposes of the accreditation removal, encapsulation, enclosure, and design of abatement in occupied requirement. For purposes of TSCA Title repair; emergency procedures for buildings: modification of guide n accreditation, asbestos abatement sudden releases; potential exposure specifications to a particular building: supervisors include those persons who ; worker and building occupant health/ provide supervision and direction to • situations; transport and disposal medical considerations: replacement of workers engaged in asbestos removal, procedures, and recommended and ACM with non-asbestos substitutes; encapsulation, enclosure, and repair. prohibited work practices. Discussion of clearance of work area after abatement; Supervisors may include those new abatement-related techniques and !I methodologies may be included, I air monitoring for clearance. individuals with the position title of. (1) Preparing abatement drawings. foreman, working foreman, or leadman (e) Personal hygiene. Entry and exit Use of as-built drawings; use of pursuant to collective bargaining procedures for the work area; use of inspection photographs and on-site agreements. Under this Model Plan, at showers: and avoidance of eating, I ■ reports; particular problems in least one supervisor is required to be at drinking, smoking, and chewing (gum or abatement drawings. the worksite at all times while work is in tobacco) in the work area; Potential (m) Contract preparation and progress. Asbestos workers must have exposures, such as family exposure, (■ administration. access to accredited supervisors shall also be included. [n] Legal/liabilities/defenses. throughout the duration of the project. (f) Additional safety hazards. Hazards Insurance considerations: bonding; hold The contractor and supervisor's encountered during abatement activities harmless clauses; use of abatement training course shall adequately address and how to deal with them, including contractor’s liability insurance: claims- the following topics: electrical hazards, heat stress, air made versus occurrence policies. (a) The physical characteristics of contaminants other than asbestos, fire (o) Replacement. Replacement of asbestos, and asbestos-containing and explosion hazards, scaffold and asbestos with asbestos-free substitutes. materials. Identification of asbestos, ladder hazards, slips, trips and falls, and (p) Role of other consultants. aerodynamic characteristics, typical confined spaces. Development of technical specification uses, physical appearance, a review of sections by industrial hygienists or hazard assessment considerations, and (g) Medical monitoring. OSHA engineers; the multidisciplinary team a summary of abatement control requirements for a pulmonary function approach to abatement design. options. test, chest X-rays and a medical history [q] Occupied buildings. Special design (b) Potential health effects related to for each employee. procedures required in occupied asbestos exposure. The nature of (h) Air monitoring. Procedures to buildings; education of occupants; extra asbestos-related diseases: routes of determine airborne concentrations of monitoring recommendations; staging of exposure: dose-response relationships. asbestos fibers, including a description work to minimize occupant exposure: and the lack of a safe exposure level; of aggressive sampling, sampling scheduling of renovation to minimize synergism between cigarette smoking equipment and methods, reasons for air exposure. and asbestos exposure; latency period monitoring, types pf samples, and (r) Relevant Federal State, and local ■ for disease. interpretation of results, specifically regulatory requirements. Procedures (c) Employee personal protective from analysis performed by polarized and standards, including: . , equipment. Classes and characteristics light, phase-contrast, and electron (1) Requirements of TSCA Title 11. of respirator types; limitations of microscopy analyses.

NYC-WTC_000318815

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000318815Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →