NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 64 pages

EPA background report, WTC air contaminants, 1987

Machine-extracted title · confidence 29%

Background report on asbestos and related contaminants for WTC environment, 1987.

NYC-WTC_000318755–000318818
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

I

- : 15832 Federal Register / Vol. 52, No. 83 ,/ Thursday, April 30, 1987 / Proposed Rules

i requirement that ail buildings for a given accreditation requirements were crucial Some committee members argued for school be added together. The to successful implementation of TSCA a regulatory provision on an employee's : committee generally agreed to require Title II. The committee established a right to refuse work, if certain personal ; addition of all contiguous portions of a work group which met several tirnes to protective measures are not taken, , project conducted in the same building • discuss accreditation matters. The training is not afforded, or if the , to determine .whether the project could committee agreed in principle on an proposed regulation is otherwise be cleared with PCM analysis. accreditation framework and delegated violated. EPA believes that this issue is Concern was expressed by the the development of exact wording to the more properly addressed by the : committee about the timing of clearance Agency. The EPA Model Plan is the only Department of Labor, but the Agency is sampling requirements. The TEM part of this regulation which is a final interested in comments on this issue. ' protocol in Appendix A reflects general Agency product Proposed § 763.91'[e) would establish work group agreement that procedures to protect building occupants measurements be made after the /. Worker and Occupant Protection from any O&M activity which disturbs. , primary containment barrier is taken The regulation, through the provisions asbestos. These procedures largely : down and after the secondary barrier is of the EPA worker protection rule, ■ involve isolation, scheduling, good work either wet-wiped or HEPA-vacuumed. extends coverage already in place for practices, proper cleaning and asbestos The committee generally agreed that O&M workers*in private schools under debris disposal. Generally, these It . aggressive samplmg should be required the OSHA’s construction standard to procedures represent simple, low-cost Ii and should be defined in the TEM pubHc sector O&M workers now activities which will help contain Fibers : protocol. This section of the regulation unprotected in schools. It also allows and coritrol asbestos debris created bv ! ; and proposed Appendix A defines a presumed to exceed the action level of maintenance activities which do not , me*od for aggressive ^pling similar q.I f/cm’), to implement the provisions disturb asbestos these precautions are • . to that used in several EPA guidance Appendix B of this rule instead of the not required. I : docents- . -J J I full scope of the EPA worker protection Finally, labelling procedures, in fl The committee considered several roonlatinn ' committee deliberations, were primarily S options under which less stringent. k intended to,prevent unknowing or 8 : clearance procedures would be allowed Some committee members. uncontrolled disturbance to ACBM by I , foUowing removal, encapsulation, and ' Parbc^ly he union representatives, maintenance personnel rather than to ’ enclosure. One of these options was to = greater personal protection identify ACBM for building occupants. ; aUow response actions to be considered measures than this coverage afforded. In The Agency is seeking comments on complete with only visual inspection particular, strong preference was whether labels should be provided in I when the project was below the point at expressed to requue respirators languages other than English and oh 1 . which the NESHAP provisions whenever ACBM is likely to be alternative labelling systems for use in E concerning asbestos demolition and disturbed, even if the fiber level is routine maintenance areas. : renovation apply-160 square feet or 260 expected to be below the 0.1 f/cm’ ’ linear feet. Another option which the ' acboulevel established by OSHA. The K. Waiver for State Programs ‘ -• considered 1 committee .... was to permit an issue was particularly contentious. Some committee members expressed the The negotiating committee’s general accredited abatement designer approach in developing the State waiver discretion on whether or not to require opinion that coverage should be consistent for public workers (covered section of the proposed rule was to air sampling. The general agreement provide States with a clear and . ■was to allow the l£A discretion to use by EPA regulations) and for private workers (covered by OSHA regulations) structured process for requesting PCM measurement on these small jobs in schools. Others indicated that.risks at waivers. The process set forth in the rather than to requireTEM for small jobs. such low levels would not warrant the proposed rule requires.that States Consideration was also given by the 'J®® respirators. EPA’s opinion is that submit specific information about their .. ^committeeon a requirement for-air .OSHA recently completed alengthy.and programs to EPA so that the Agency can ' sampling for clearance after small jobs detailed worker protection rulemaking make an informed decision about . - , of short duration. The committee proceeding to develop the action level whether to grant or deny a waiver • I ! generally agreed to allow these jobs, . and EPA docs not intend to reassess the request.. The committee attempted to ,. i , which often involve .a foot or less of OSHA determination regarding worker strike a balance between providing EPA . 11 ' ACBM, to be considered complete after protection. EPA is, however, committed with adequate information for this ■ ! "they have passed a careful visual to changing the provisions of the worker purpose without making the waiver f inspection. protection rule (and hence, this • request unduly burdensome oil the ‘ f! regulation) to conform with any States. ... /.Accreditation Much of the discussion of State modifications adopted by OSHA in the Appendix C, appearing in a notice area of worker protection that may ■ waivers pertained to time periods elsewhere in this edition of the Federal result from the litigation on OSHA’s allowed for various steps in the waiver Register, includes the final Model rule. In addition, the Committee agreed : process. EPA is interested in receiving ; Contractor Accreditation Plan for States that information on respiratory comments about the deadlines and time required by TSCA Title II. As the protection, as contained in “A Guide to intervals set forth in this section of the negotiating committee developed its Respiratory Protection for the Asbestos . proposed rule. . j ■ . approach to the inspection, assessment, - Abatement Industry” (White Book) EPA is also interested in comments ? i and response action sections of the September 1988, published jointly by about the requirements to hold a public ■ proposed rule which provide flexibility EPA and National Institute for hearing in a State upon request. based on professional judgment and Occupational Safety and Health Specifically, what types of concerns or - I .local circumstances, the committee. (NIOSH), should be made available to issues warrant a public hearing on a i generally agreed that stringent . workers during their O&M training. State waiver request?

NYC-WTC_000318768

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000318768Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →