NYC-WTC_000388470
Night preliminary daily workforce report for World Trade Center, November 27, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗Night preliminary daily workforce report for World Trade site, listing crews and equipment.
NYC-WTC_000305526OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP. 151-45 SUi Road, WliftMtone, N.Y. 113S7-(718) 767-9000 DATE. 1-9-02 NIGHT PRELIMINARY as DAILY WORK FORCE REPORT
Job Name & Location; World Trade Center Contract No. Weather Conditions
Labor Equipment CLASSIFICATION QUANT. Description MANNED STANDBY IDLE SUPERINTENDENT 2 CAT 966 LOADER 1 PROJECT ENGINEER 1 CAT 446 BACKHOE 1 loFFICE ENGINEER CAT 973 LOADER 1 FOREMEN 2 CAT 36S ORAPPLER 1 [SAFETY OFFICER CAT 375 BUCKET 1 [LABORERS 14 CAT376 ORAPPLER 1 IRON WORKERS VTACHI7S0 GRAPPLER 1 LOCAL 14 5 WtAdHi 560 BUCKET 1 LOCAL 16 9 tfTACHt tiOO (WAPPLER 1 CARPENTER 185 CFMCOMPRE3SOR 1 CARPENTER FOREMAN 235 HAMMER HOE RAM 1 TEAMSTERS 1 MECHANICS TRUCK 1 MECHANICS 2 •QOL TRUCK___________ HOUSE WRECKERS 7 [TOOL VAN [ROLL OFF IP TRAILERS [low" bed TRAILER DELIVERIES; HIGH DECK TRAILERS WELDING TRUCK FUEL TRUCK 1 PICKUP TRUCKS 3 LIGHT TOWERS 1
1 I SITE MULE 3 DUMP TRUCKS '□7 777-. -.. . . ....J. •LIGHT TOWERS USED FOR 2 HOURS DURING DAY . 10 WHEEL DUMP TRUCK ■j FLASHING ARROW BCARC I
1 OFFICE TRAILE.R.'GENER '[CARGO BOXES I "flat TRUCK 'rump "" 'rA.NMAKD" GEN’E F~ 'I Cfjscnpiion of Wc."x;_____________________________ A:‘!riClPATED WORK CONTINUE REMOVING DEBRIS FROM LOWER LEV; MAINTAIN TRAFFIC FLOW INTO AND OUT OF AREA MAN WATERING STATIONS FOR DUST CONTROL '.LOADS OUT:__________________________________ SCXES OUT;
GRACE CONTRACTING CORP’ proved 3y:
' -
CITy_21MC100_004389581
NYC-WTC_000305526
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000388470
Night preliminary daily workforce report for World Trade Center, November 27, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302507
Night preliminary daily workforce record for World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000432608
Night shift daily workforce and equipment assignments for WTC project site.
1 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302397
Daily workforce and equipment report for World Trade Center project, December 14, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305499
Day preliminary workforce and equipment listing for World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322203
Day final daily workforce report for Trade Center site on Nov 18, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000302472
Night preliminary daily workforce and equipment for World Trade site, Dec 19, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419312
Day final daily workforce and equipment for World Trade, February 21, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305515
Day FINAL daily workforce and equipment for World Trade Center site, February 2002.
1 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000419178
Night final daily workforce and equipment for 2/5/02 World Trade.
1 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291332
Day final daily workforce and equipment for World Trade Center, Feb 6, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000291405
Day shift final daily workforce report for World Trade site, Dec 16, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
Page similarity is temporarily unavailable or this page has no indexed vector.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000388470
Night preliminary daily workforce report for World Trade Center, November 27, 2001.
Similar indexed content
NYC-WTC_000302507
Night preliminary daily workforce record for World Trade Center site.
Similar indexed content
NYC-WTC_000432608
Night shift daily workforce and equipment assignments for WTC project site.
Similar indexed content
NYC-WTC_000302397
Daily workforce and equipment report for World Trade Center project, December 14, 2001.
Similar indexed content
NYC-WTC_000305499
Day preliminary workforce and equipment listing for World Trade Center site.
Similar indexed content