ICS 201 summary, 2/23–3/1/02

Machine-extracted title · confidence 44%

ICS 201 summary covering 2/23–3/1/02 with period dates and city ID.

NYC-WTC_000304494–000304498
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

ICS 201 Summary of Current Actions Updated as of 1600, 3/01/02 shipped off-site for disposal.

In addition, approximately 627,665 gallons of fuel oil and/or oily water mixture have been pumped from basements, manholes, trenches and USTs.

o WTCLOJVEJi MANHATTAN SAMPLING GROUP - JIMENEZ. NORRELL, TEITZ, HALE, MUSTAFA, PATEL

Collection of airborne asbestos samples continued. Two twelve hour samples are taken at each fixed station per day. Debris offloading operations at Pier 6 have been discontinued, all related equipment is in the process of being removed. Stations U and V will remain in operation until all equipment is removed. Meeting was held between OSC’s and Tetra Tech contractors in order to maximize the volume of air being pulled for each sample. A priority is being placed on run time, OSC’s suggested several options for maximizing sample volumes. Tetra Tech will change flow volumes and piggyback batteries in order to come as close to 720 minutes of run time as possible.

VOC samples continued to be taken in the ground zero excavation. Analysis is performed in the Region 2 Mobile Laboratory and results provided to FDNY and the demolition contractors working at ground zero. VOC levels throughout the week remained at very low levels.

A meeting was held with sampling group field personnel and deputy Chief Spadaforo of FDNY, to discuss sampling needs at ground zero. The chief requested that VOC samples be taken at two specific locations where FDNY personnel are working. The locations were sampled during the week, and results showed levels of contaminants below the detection level of the laboratory instrument.

Bulk sampling is being planned for the week of March 4*, in the ground zero excavation. On March 5* composite samples will be taken for all parameters included on the Target Compound List and the Target Analyte list. Bulk asbestos samples will be taken also in the ground zero excavation. Asbestos will be taken on a weekly basis with the assistance of Tetra Tech.

ICS 201

CITY_21MC100_004221780

NYC-WTC_000304498

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000304498Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

ICS 201 summary, Mar 29 2002

NYC-WTC_000303141

ICS 201 summary for period 3/23–3/29/02, NYC-WTC file CITY_21MC100_009041350.

Similar indexed content

Compare copies and versions →