NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 53 pages

Status of DEP nonpoint source projects, 2001

Machine-extracted title · confidence 49%

Status report on DEP nonpoint source pollution projects and activities, Jul–Sep 2001.

NYC-WTC_000290962–000291014
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

During the quarter, the GCSWCD’s efforts focused on the Big Hollow Restoration Project. The Big Hollow reach is located in the headwaters of the Batavia Kill sub-basin, and is nearly one mile long. The GCSWCD finalized its bid specifications and final engineering plans, bid the project, and awarded the project to Fastracs, Inc. Fastracs bid 5585,000 for the project, which includes cutting the new planform channel, grading the floodplain to the design elevation, constructing stream flow deflectors (rock vanes) and grade control devices (cross vanes), and installing the bio-engineering.

Construction was initiated in August 2001. GCSWCD, with DEP’s concurrence, decided on September 17th to halt channel construction and move immediately to final channel and floodplain grading and bioengineering. This decision reflects the importance of installing the bioengineering on the newly constructed channel. .Approximately 60% of the restored channel was completed by the close of the quarter, and will be fully bioengineered during the Fall. The bioengineering scoped as part of Fastracs contract will be supplemented by volunteer plantings scheduled November 10-11,2001. This volunteer effort, initiated by GCSWCD and Trout Unlimited, and organized with the assistance of the SMP, was planned during the quarter.

GCSWCD led a field tour for some 50 conference participants to the Big Hollow and Brandywine sites as part of a Stream & Floodplain Restoration Conference, September 24- 25, in Albany, NY.

For more detailed information on the status of the Big Hollow project, see h 11 p ://^;cs\vcd .co m/st re.a m.

II) Stream Management Plans in Priority Sub-Etasins

Contracts for multi-objective, community-based Stream Management Plans and geomorphically based restoration-demonstration projects currently in place with the Greene, Sullivan, and Delaware County Soil and Water Conservation Districts for the Stony Clove Creek in the Ashokan Basin, the Chestnut Creek in the Rondout Basin, and the West Branch Delaware River in the Cannonsville Basin, respectively. Funding for these plans was secured through the Watershed Environmental Assistance Program (WEAR) of the Watershed Resources Development Act (WRDA), and administered by the NY District Army Corps of Engineers.

During the quarter, the Project Management Plan (PMP) and Project Cooperation Agreement (PCA) between DEP and the ACOE for each of these three projects was drafted and revised, with final paperwork to be submitted in the next quarter to ACOE Division Headquarters.

33

NYC-WTC_000290996

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000290996Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000137900

Archival folder label for Department of Environmental Protection biweekly reports related to World Trade Center activities from 2000 to 2001.

Similar indexed content

Compare copies and versions →