NYC-WTC_000302737
Chain of custody for 125 Cedar Street project; cleaning by abatement contractor and monitoring required.
14 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗Draft scope detailing on-site air monitoring and clearance sampling requirements.
NYC-WTC_000282507–000282516OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
DRAFT Proiwt Monitoring
1. The project monitor shall provide oversight of clean-up activities to ensure compliance with project specifications, tenants authorizations, and applicable rules and regulations. The project monitor shall be present on site dining all cleaning activities. The project monitor shall coordinate all scheduling requirements for timely completion of the work (completion of work area preparation and cleaning activities within three (3) weeks. The project monitor shall maintain the inventory of valuable items in each unit as provided by tenants. A copy of the contractor requirements is attached. For additional and specific tasks, refer to this attachment.
2. The project monitor shall provide daily monitoring of all work activities to insure compliance with the scope-of-work, the applicable rules and regulations, and the contracts. This includes but is not limited to the verification of worker certification status, the use of proper engineering controls and appropriate work practices.
3. The project monitor shall direct corrective actions when appropriate and shall be responsible to stop work until corrections are made. Findings must be reported immediately to DEP via telephone call. Written notification of observation and corrective actions must be received by the DEP within 48 hours of telephone call.
4. A final report shall be submitted to the DEP within 7 days of project completion. The report shall clearly identify the work performed in each unit and shall include all laboratory reports, chain-of- custody forms, field notes, copies of employee credentials (i.e. certificates), tenant and owner authorizations, etc.
5 of 5
CITY_DEP_WORBY_CANNATA_SUBP_000005961
NYC-WTC_000282515
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000302737
Chain of custody for 125 Cedar Street project; cleaning by abatement contractor and monitoring required.
14 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000265735
Scope of work for asbestos cleaning monitor on 125 Cedar Street interior, 12 stories.
14 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000307885
Mandatory pre-bid for 125 Cedar Street WTC cleanup; overview of asbestos sampling and monitoring.
12 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000287596
Comprehensive asbestos air sampling results across NYC ER and Fresh Kills sites; most below standard.
5 shared non-person entities · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107194
Notice of mandatory pre-bid meeting and scope of work for interior cleaning and environmental monitoring at 125 Cedar Street.
14 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100879
Permit document detailing the installation of a heavy-duty shed and facade repairs at 114 Liberty Street in May 2002.
15 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107365
Document outlining the scope of work for environmental sampling, air monitoring, and asbestos abatement at 125 Cedar Street.
14 shared non-person entities · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000108786
A document listing seven licensed contractors authorized to perform clean-up and abatement work at the World Trade Center site.
14 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141536
Request outlining DEP procurement and EPA supervision of cleaning and sampling contracts for Lower Manhattan residents.
4 shared non-person entities · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000160896
Inquiry regarding an asbestos addendum and scope of work document circulated by the EPA for World Trade Center cleanup.
5 shared non-person entities · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096696
Document outlining the scope of work for a mandatory pre-bid meeting and interior cleaning contract at 125 Cedar Street to remove debris and dust.
5 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000160683
Transmission of WTC-related Q and A document to interagency task force with EPA Regional contact information.
7 shared non-person entities · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000425478
Draft scope of work document outlining environmental sampling, air monitoring, and cleaning procedures for the interior of 114 Liberty Street.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000426105
Draft scope of work document outlining environmental sampling, air monitoring, and cleaning procedures for the interior of 114 Liberty Street.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000425404
Draft scope of work document outlining environmental sampling, air monitoring, and cleaning procedures for the interior of 114 Liberty Street.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429124
Draft scope of work document outlining environmental sampling, air monitoring, and cleaning procedures for the interior of 114 Liberty Street.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000232099
Draft scope of work document outlining environmental sampling, air monitoring, and cleaning procedures for the interior of 114 Liberty Street.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000435224
Scope for on-site asbestos air monitoring during interior cleaning at 125 Cedar Street.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000302737
Chain of custody for 125 Cedar Street project; cleaning by abatement contractor and monitoring required.
Similar indexed content
NYC-WTC_000107194
Notice of mandatory pre-bid meeting and scope of work for interior cleaning and environmental monitoring at 125 Cedar Street.
Similar indexed content
NYC-WTC_000100879
Permit document detailing the installation of a heavy-duty shed and facade repairs at 114 Liberty Street in May 2002.
Similar indexed content
NYC-WTC_000107365
Document outlining the scope of work for environmental sampling, air monitoring, and asbestos abatement at 125 Cedar Street.
Similar indexed content
NYC-WTC_000265735
Scope of work for asbestos cleaning monitor on 125 Cedar Street interior, 12 stories.
Similar indexed content