NYC-WTC_000302737
Chain of custody for 125 Cedar Street project; cleaning by abatement contractor and monitoring required.
14 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗Draft scope detailing on-site air monitoring and clearance sampling requirements.
NYC-WTC_000282507–000282516OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
DRAFT 4. Sampling equipment shall be placed at representative locations and away fi-om obstruction. Sampling cassette must be placed on a tripod and not taped to existing surfaces. All air sampling equipment shall be pre- and post- calibrated to insure accurate air sampling volumes.
5. The Air Sampling Technician shall perform clearance air sampling after the areas are free of dust accumulations as determined by the Project Monitor. All surfaces must be completely dry prior to the start of sampling. The HVAC systems shall be run for a minimum of 5-6 hours prior to clearance sampling. Clearance air sampling shall be performed at each apartment. Five samples shall be collected in each apartment and two samples shall be collected in each common space. The elevator shaft shall be cleared separately. Clearance air monitoring shall be performed after the completion of all clean up activities at the work site. Clearance air sampling shall be aggressive and performed in accordance with Title 15, Chapter 1 of the RCNY Section 1-43 (a)-(d).
6. Clearance air samples shall be collected in accordance with the procedures specified in the NIOSH 7400 Method. The flow rate for collection of air samples shall be at least 10 liters per minute and no more than 15 liters per minute. Air sampling cassettes must be monitored to ensure the filters do not develop dark spots that would indicate clogging. The minimum sampling volume is 3600 liters. If clogging develops, the cassette must be changed.
7. All clearance air samples and completed chain of custody forms must be transported to the laboratory immediately after sampling is completed.
Clearance Criteria
1. The following clearance levels have been established by the USEPA for clean up activities resulting fi-om the collapse of the WTC.
Parameter Clearance Level Note Asbestos in air 0.0009 f/cc PCMe Primary clearance level Lead in settled dust <25 gg/^__________ Primary clearance level Dioxin in settled dust <4ng/m____________ Primary clearance level Fibrous glass in air <0.01 f/cc Secondary clearance level Crystalline silica in air 0.5pg/m^ _________ Secondary clearance level PAHs in settled dust <0.3 mg/m^ ~ Secondary clearance level Mercury between 1 and 2 mg/n7 Secondary clearance level
2. Cleaning shall not be considered compete unless the primary clearance levels are achieved. The apartment will be re-cleaned and retested if the primary clearance levels are not achieved. These clearance levels may be re-evaluated and revised if determined necessary based on field conditions and analytical limitations. Secondary clearance levels shall be considered in determining the need for additional cleanup, however failure to meet the secondary clearance levels does not automatically trigger the re-cleaning.
4 of 5
CITY_DEP_WORBY_CANNATA_SUBP_000005959
NYC-WTC_000282513
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000302737
Chain of custody for 125 Cedar Street project; cleaning by abatement contractor and monitoring required.
14 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000265735
Scope of work for asbestos cleaning monitor on 125 Cedar Street interior, 12 stories.
14 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000307885
Mandatory pre-bid for 125 Cedar Street WTC cleanup; overview of asbestos sampling and monitoring.
12 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000287596
Comprehensive asbestos air sampling results across NYC ER and Fresh Kills sites; most below standard.
5 shared non-person entities · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107194
Notice of mandatory pre-bid meeting and scope of work for interior cleaning and environmental monitoring at 125 Cedar Street.
14 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100879
Permit document detailing the installation of a heavy-duty shed and facade repairs at 114 Liberty Street in May 2002.
15 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107365
Document outlining the scope of work for environmental sampling, air monitoring, and asbestos abatement at 125 Cedar Street.
14 shared non-person entities · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000108786
A document listing seven licensed contractors authorized to perform clean-up and abatement work at the World Trade Center site.
14 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141536
Request outlining DEP procurement and EPA supervision of cleaning and sampling contracts for Lower Manhattan residents.
4 shared non-person entities · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000160896
Inquiry regarding an asbestos addendum and scope of work document circulated by the EPA for World Trade Center cleanup.
5 shared non-person entities · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096696
Document outlining the scope of work for a mandatory pre-bid meeting and interior cleaning contract at 125 Cedar Street to remove debris and dust.
5 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000160683
Transmission of WTC-related Q and A document to interagency task force with EPA Regional contact information.
7 shared non-person entities · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000390019
Draft scope detailing asbestos abatement, cleaning, monitoring and clearance at 114 Liberty Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000282459
Scope of work for 114 Liberty Street asbestos cleaning and monitoring; pre-abatement plan.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000390024
Chain of custody document for asbestos-related sampling at 115 West Broadway project.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155138
Documentation of sample chain of custody procedures for the 114 Liberty Street site.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000362539
Scope of work for asbestos abatement monitoring and sampling at 114 Liberty Street, Manhattan.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000362534
Draft DEP scope detailing on-site air monitoring and clearance sampling for asbestos abatement at 114 Liberty Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000302737
Chain of custody for 125 Cedar Street project; cleaning by abatement contractor and monitoring required.
Similar indexed content
NYC-WTC_000107194
Notice of mandatory pre-bid meeting and scope of work for interior cleaning and environmental monitoring at 125 Cedar Street.
Similar indexed content
NYC-WTC_000100879
Permit document detailing the installation of a heavy-duty shed and facade repairs at 114 Liberty Street in May 2002.
Similar indexed content
NYC-WTC_000107365
Document outlining the scope of work for environmental sampling, air monitoring, and asbestos abatement at 125 Cedar Street.
Similar indexed content
NYC-WTC_000265735
Scope of work for asbestos cleaning monitor on 125 Cedar Street interior, 12 stories.
Similar indexed content