NYC-WTC_000302737
Chain of custody for 125 Cedar Street project; cleaning by abatement contractor and monitoring required.
14 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗Draft scope detailing on-site air monitoring and clearance sampling requirements.
NYC-WTC_000282507–000282516OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
DRAFT Air Sampling Technicians Air monitoring technicians must posses valid NYS Asbestos Project Sampling Technician (APST) certificates. Technicians must have performed air sampling for at least 6 months. At a minimum at least 5 Air Sampling Technicians must be assigned to this project. A single individual with Asbestos Project Monitor and Asbestos Project Sampling Technician certification shall not perform the functions of both Monitor and Technician during this project.
Wipe Sampling Technicians Wipe sampling technicians must have l-year experience in wipe sampling for a variety of contaminants and have received state certified training in dust sampling. At a minimum at least 2 Wipe Sampling Technicians must be assigned to this project.
Equipment Sampling equipment must be in sufficient quantity to provide the amount and type of samples required for this project. At a minimum the following equipment are required: air-sampling pumps with flow rate capacities of 2 to 10 liters per minute, tripods, rotometers, sample cassettes with mixed cellulose ester filters having pore size of O.Spm, micro vacuum, disposable porous cellulosic towellettes moistened with wetting agent and solvent-wetted sampling agent.
Analytical Laboratory The environmental laboratory must be certified by the New York State Department of Health. Certification for all the analytes specified herein must have been maintained for at least six (6) consecutive proficiency testing rounds. The laboratory must possess a gas chromatograph equipped with a capillary column and high-resolution mass spectrometer for analyzing dioxin and inductively coupled plasma for total metals. Cold Vapor Method apparatus shall be used for mercury analysis.
Proof of qualifications must be presented to the NYCDEP prior to commencement of work. The NYCDEP reserves the right to disqualify any individual(s) from work on this project for non-compliance with these specifications or the requirements of applicable rules and regulations.
Specifications
It is anticipated that the work will be completed within three (3) weeks.
Sampling and Analytical Procedures for Lead, PAHs, Dioxin, Fibrous Glass, Silica, and Mercury
1. Sampling for lead, PAHs, dioxin, fibrous glass, crystalline silica and mercury shall be performed by the wipe sampling technician. A completed chain of custody must accompany all samples. A unique sample number shall be assigned to each sample. A complete written description and/or diagram shall clearly identify each sampling location.
2. Post cleaning air samples for fibrous glass and silica shall be collected concurrently with the asbestos clearance air sampling procedures specified herein. Five samples for fibrous glass and one sample for silica shall be collected in each apartment.
2 of 5
CITY_DEP_WORBY_CANNATA_SUBP_000005955
NYC-WTC_000282509
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000302737
Chain of custody for 125 Cedar Street project; cleaning by abatement contractor and monitoring required.
14 shared non-person entities · 1 shared topics · similarity 0.999
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000265735
Scope of work for asbestos cleaning monitor on 125 Cedar Street interior, 12 stories.
14 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000307885
Mandatory pre-bid for 125 Cedar Street WTC cleanup; overview of asbestos sampling and monitoring.
12 shared non-person entities · 1 shared topics · similarity 0.966
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000287596
Comprehensive asbestos air sampling results across NYC ER and Fresh Kills sites; most below standard.
5 shared non-person entities · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107194
Notice of mandatory pre-bid meeting and scope of work for interior cleaning and environmental monitoring at 125 Cedar Street.
14 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100879
Permit document detailing the installation of a heavy-duty shed and facade repairs at 114 Liberty Street in May 2002.
15 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107365
Document outlining the scope of work for environmental sampling, air monitoring, and asbestos abatement at 125 Cedar Street.
14 shared non-person entities · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000108786
A document listing seven licensed contractors authorized to perform clean-up and abatement work at the World Trade Center site.
14 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141536
Request outlining DEP procurement and EPA supervision of cleaning and sampling contracts for Lower Manhattan residents.
4 shared non-person entities · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000160896
Inquiry regarding an asbestos addendum and scope of work document circulated by the EPA for World Trade Center cleanup.
5 shared non-person entities · similarity 0.962
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000096696
Document outlining the scope of work for a mandatory pre-bid meeting and interior cleaning contract at 125 Cedar Street to remove debris and dust.
5 shared non-person entities · 1 shared topics · similarity 0.961
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000160683
Transmission of WTC-related Q and A document to interagency task force with EPA Regional contact information.
7 shared non-person entities · similarity 0.960
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000390024
Chain of custody document for asbestos-related sampling at 115 West Broadway project.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000362534
Draft DEP scope detailing on-site air monitoring and clearance sampling for asbestos abatement at 114 Liberty Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000362539
Scope of work for asbestos abatement monitoring and sampling at 114 Liberty Street, Manhattan.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000390019
Draft scope detailing asbestos abatement, cleaning, monitoring and clearance at 114 Liberty Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000429313
Scope of Work for 114 Liberty Street asbestos monitoring and sampling.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000155138
Documentation of sample chain of custody procedures for the 114 Liberty Street site.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000302737
Chain of custody for 125 Cedar Street project; cleaning by abatement contractor and monitoring required.
Similar indexed content
NYC-WTC_000107194
Notice of mandatory pre-bid meeting and scope of work for interior cleaning and environmental monitoring at 125 Cedar Street.
Similar indexed content
NYC-WTC_000100879
Permit document detailing the installation of a heavy-duty shed and facade repairs at 114 Liberty Street in May 2002.
Similar indexed content
NYC-WTC_000107365
Document outlining the scope of work for environmental sampling, air monitoring, and asbestos abatement at 125 Cedar Street.
Similar indexed content
NYC-WTC_000265735
Scope of work for asbestos cleaning monitor on 125 Cedar Street interior, 12 stories.
Similar indexed content