NYC-WTC_000281078
Log entry for Pensacola project reception and reporting date.
5 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗Receiving/Report record for Pensacola project; includes log number.
NYC-WTC_000281084–000281089OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
Received: 11'/27/01 Zhii^ 'll " . aso 478 2871 -> AMEC CONSTRUCTION MANAGEMENT *.t £
Nov 27 01 OS:05a j -/Pensaco1 a 850 478-2671 - v.
11 t t SEVERN TRENT ii i ; ’I SERVICES ;s--
STL Pensacola .'if,.: >: V ' LOG NO: Cl--ii44'i.\ V i Received: 17 NOV 61 ■' !. : Reported: 21 NOV 013-.: Mr. Jeff T.isp st' H AMEC 2 85 Davidspnh. i.«« nue Somerset, iljljS । 1 -1 Requisition: 174180000.„i,;; i ■ :• Ji zs: Project: world:TRADE CENTER, Ny/’nY.v Sampled By: Client Code: 131011121> REPORT OF RESULTS Page 6 DATE/ LOG NO SAMPLE -IpWl P|ION , Q.C REPORT FOR AIR SAMPLES TIME SAMPLED
11443-4 'Method 114 43-^ Lab CorLt^xj.: tandard % Recovery PARAMEjrER 11443-4: 11443-5 'I! Surrogate Toluene-^c 3^ ' ii 101 % 101 % Surrogate - 4-Brotjio^^ J : rc^b'enzene. 99 % 99 % Dilution Factor :■!. ' ;i 1 Analysis Date Hr ii 11.19.01 Batchi ID -i ; Prep ijlethpd HE IT MAB233 MOD-TOI4 r4AB233
• Analyst BH
These test requit a nqet all the requirements of NELAC. All questions regarding thiq report should be directed to the STL Project Manager who signed this-Ke® ■Ireport. See thei Project’ijs Ie Inspection Form (PSIF) to determine if a sample was received that jd;^^ pi eserjvBtion, i i meet EPA requirements for sample collection, ^ng time . : ■ ■ iK ■
ii-. I P 10 I Lance Larson^ Proje >'l 9per i
-M •i ill i r
Final Page Of Report ! ■i: E- i i Ji H- oh; I! CITY_21MC100_002962083
NYC-WTC_000281089
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000281078
Log entry for Pensacola project reception and reporting date.
5 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000281072
Receiving/log report from AMEC Construction Management for Pensacola site.
5 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000341767
Continued AMEC construction log with receipt and page indicators.
5 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000341761
Page from AMEC construction log for Pensacola; time stamp and page details.
4 shared non-person entities · 1 shared topics · similarity 0.988
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000281348
Chain-of-custody cover for AMEC submission; WTC project, Nov 2001.
5 shared non-person entities · 1 shared topics · similarity 0.986
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000281355
Chain-of-custody/log entry for AMEC submission; World Trade Center project.
5 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000341755
Site Pensacola project log page with transmission stamp and STL reference.
4 shared non-person entities · 1 shared topics · similarity 0.985
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000341773
Form page from AMEC construction management; Pensacola project reference.
1 shared non-person entities · similarity 0.937
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000341779
Chain of Custody Record for asbestos/lead/environmental analysis; EMSL lab.
1 shared non-person entities · similarity 0.917
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000101047
Automated log confirming transmission of 6 pages to DEP lead tracking unit on April 3, 2003.
1 shared non-person entities · 1 shared topics · similarity 0.918
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000121183
Air monitoring report for 345 South End Avenue buildings conducted in February and March 2002 showing TEM results.
1 shared non-person entities · similarity 0.916
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000101006
Facsimile transmission cover sheet sending laboratory reports from ATC Associates to JLC Environmental Consultants in April 2003.
1 shared non-person entities · 1 shared topics · similarity 0.915
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000341767
Continued AMEC construction log with receipt and page indicators.
Similarity score 0.982 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000341761
Page from AMEC construction log for Pensacola; time stamp and page details.
Similarity score 0.980 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000281355
Chain-of-custody/log entry for AMEC submission; World Trade Center project.
Similarity score 0.980 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000281072
Receiving/log report from AMEC Construction Management for Pensacola site.
Similarity score 0.979 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000341755
Site Pensacola project log page with transmission stamp and STL reference.
Similarity score 0.979 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000281348
Chain-of-custody cover for AMEC submission; WTC project, Nov 2001.
Similarity score 0.979 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
Log entry for Pensacola project reception and reporting date.
Similar indexed content
Receiving/log report from AMEC Construction Management for Pensacola site.
Similar indexed content
NYC-WTC_000341767
Continued AMEC construction log with receipt and page indicators.
Similar indexed content
NYC-WTC_000341761
Page from AMEC construction log for Pensacola; time stamp and page details.
Similar indexed content
NYC-WTC_000281348
Chain-of-custody cover for AMEC submission; WTC project, Nov 2001.
Similar indexed content