NYC-WTC_000419158
Day final daily workforce at World Trade Center site, Jan 24, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗Daily workforce report for World Trade site with labor and equipment details.
NYC-WTC_000280701OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
GRACE CONTRACTING CORP.
151-45 6th Road. Whitestone. N.Y. 11357-(718) 767-9000 DATE: 10-19-01 DAY END
DAILY WORK FORCE REPORT
Job Name & Location: World Trade Canter Contract No. Weather Conditions
Labor [_____________ Equipment CLASSIFICATION QUANTIT iIf Description MANNED IDLE SUPERINTENDENT 2 fCAT 966 LOADER ~ 1 PROJECT ENGINEER 2 |CAT f 446 BACKHOE 1 OFFICE ENGINEER 1 HiCAT 973 LOADER 1 FOREMEN 1 fCAT 245 GRAPPLER 1 LABORERS 15 fCAT 375 GRAPPLER 1 IRON WORKERS 1 liHITACHI 750 1 LOCAL 14 4 HiHITACHI 550 GRAPPLER 1 LOCAL 15 •7 |[i[hITACHI 1200 1 CARPENTER COMPACTION TRUCK CARPENTER FOREMAN 2 MECHANICS TRUCK 2 TEAMSTERS 21 TOOL TRUCK 1 MECHANICS 5 TOOLVAN 1 HOUS^WRECKERS ROLL OFF 2 DUMP TRAILERS 10 LOW BED TRAILER HIGH DECK TRAILERS 8 WELDING TRUCK 1 FUEL TRUCK 1 PICKUP TRUCKS 5 LIGHT TOWERS 6 PARTS TRUCK 1 DUMP TRUCKS CAP RENTS LIGHT TOWER 10 WHEEL DUMP TRUCK LIQUID OXYGEN 9 OXYGEN TRAILER 1 OXYGEN 80 ACETELYNE (MED) 10 LaCETELYNE (LARGE) 20 OFFICE TRAILER 1 TUBE TRAILER 3
Description of Work:______________________________________________________________ 3 45 MINUTE DELAY BY FIRE DEPT. WORKING ON SOUTH SIDE TOWER 2 CUTTING UP STEEL AND REMOVING DEBRIS MAN TARPING STATION CONTINUE BUILDING ACCESS ROADWAY TO VISTA HOTEL MAN WATER STATIONS FOR DUST CONTROL MAINTAIN TRAFFIC FLOW IN AND OUT OF AREA LOAD OUT 75 ( 63 ) ON GRACE TRUCKING
GRACE CONTRACTINGJ^ORP—) Approved By: Titiei ,B’ For: suPERirrrENoeljT
/
CITY_21MC100_003918546
NYC-WTC_000280701
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000419158
Day final daily workforce at World Trade Center site, Jan 24, 2002.
2 shared non-person entities · 1 shared topics · similarity 0.984
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356675
Daily workforce and equipment log for WTC site work by Grace Contracting.
2 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278669
Night shift daily workforce and equipment roster for World Trade Center site.
1 shared non-person entities · 1 shared topics · similarity 0.981
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305092
Day shift crew and equipment at World Trade; Feb 6, 2002.
1 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279789
Daily workforce and equipment tally for World Trade Center site.
2 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278405
Daily workforce roster and equipment at World Trade Center construction site.
2 shared non-person entities · 1 shared topics · similarity 0.980
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000280028
Day end daily workforce and equipment listing for World Trade Center site, Oct 2001.
3 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000290380
Daily workforce assignments and equipment listed for World Trade Center site, Oct 2001.
3 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305579
Night shift daily workforce and equipment at World Trade site, Nov 25, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.979
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000322118
Daily workforce and equipment details for World Trade Center site, including personnel roles and machinery.
2 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000269187
Night preliminary daily workforce and equipment listing for World Trade Center.
2 shared non-person entities · 1 shared topics · similarity 0.978
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388208
Night final daily workforce and equipment at World Trade site, Nov 11, 2001.
2 shared non-person entities · 1 shared topics · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗No available related records indexed in this group.
Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000419158
Day final daily workforce at World Trade Center site, Jan 24, 2002.
Similarity score 0.992 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000356675
Daily workforce and equipment log for WTC site work by Grace Contracting.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278669
Night shift daily workforce and equipment roster for World Trade Center site.
Similarity score 0.991 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000305092
Day shift crew and equipment at World Trade; Feb 6, 2002.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000279789
Daily workforce and equipment tally for World Trade Center site.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278405
Daily workforce roster and equipment at World Trade Center construction site.
Similarity score 0.990 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000419158
Day final daily workforce at World Trade Center site, Jan 24, 2002.
Similar indexed content
NYC-WTC_000356675
Daily workforce and equipment log for WTC site work by Grace Contracting.
Similar indexed content
NYC-WTC_000278669
Night shift daily workforce and equipment roster for World Trade Center site.
Similar indexed content
NYC-WTC_000305092
Day shift crew and equipment at World Trade; Feb 6, 2002.
Similar indexed content
Daily workforce and equipment tally for World Trade Center site.
Similar indexed content