NYC-WTC_000278972
MTBE and chlorodifluoromethane discharge data for WTC sump/dewatering, Jan–Feb 2002.
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗MWD water quality testing results for WTC sump discharge, listing MTBE and related figures.
NYC-WTC_000280692
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
BOVIS LEND LEASE 6/11/02
World Trade Center - Sumping/Dewatering MTA Job #01-4906 Water Quality MTBE Concentration
West St. Greenwich St. Dewatering Sump Dewatering Laboratory Date Of Sample Discharge (opb) Discharge (ppb) (ppb)
STL Laboratories 4/10/02 2.2 8.4 4/15/02 2.3 15 4/22/02 2.0 32 4/29/02 1.5 250 0.2 u 5/6/02 1.3 140 5/13/02 1.2 85 2.0 5/22/02 2.1 49 5/28/02 34 0.3 u
u = undetected
PTn/pnn®i Nvoiaawv HONaHiaaow ' osee 2.Z9 eZ6 XVd ZS:ST ZOOZ/T1/9O CITY_21MC100_0 02961579
NYC-WTC_000280692
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000278972
MTBE and chlorodifluoromethane discharge data for WTC sump/dewatering, Jan–Feb 2002.
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000186488
Summary table of water quality monitoring data for MTBE levels at the World Trade Center sumping and dewatering site from December 2001 through July 2002.
1 shared non-person entities · 1 shared topics · similarity 0.994
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000388641
MTBE and related contaminants across labs for sump and dewatering discharge, May 2002.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000330640
Discharge sample results for MTBE and chlorodifluoromethane across dates.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278954
MTBE and discharge levels across multiple dates; lab results table.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000387948
Water quality sheet listing MTBE and related discharge concentrations for WTC dewatering.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000330665
MTBE and related compounds data for sump discharge and dewatering discharge.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000361057
MTBE and chlorodifluoromethane/discharge results from sump and wells, with dates shown in 2001–2002.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000330699
Chlorodifluoromethane sequence across multiple samples at WTC site.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000202720
Data table tracking chlorodifluoromethane concentrations in sump and dewatering water samples over several months.
1 shared non-person entities · 1 shared topics · similarity 0.990
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000202794
Log of MTBE concentration measurements in water samples from the World Trade Center sumping and dewatering project over a six-month period.
1 shared non-person entities · 1 shared topics · similarity 0.992
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000331020
Decontamination-testing data; chlorodifluoromethane concentrations in sump discharge and wells.
1 shared non-person entities · 1 shared topics · similarity 0.991
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000186488
Summary table of water quality monitoring data for MTBE levels at the World Trade Center sumping and dewatering site from December 2001 through July 2002.
Similarity score 0.998 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000330665
MTBE and related compounds data for sump discharge and dewatering discharge.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000330713
Dewatering site water chlorodifluoromethane readings across dates.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000278972
MTBE and chlorodifluoromethane discharge data for WTC sump/dewatering, Jan–Feb 2002.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000387948
Water quality sheet listing MTBE and related discharge concentrations for WTC dewatering.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000330721
Laboratory water results for MTBE at WTC sump; shows dates and lab values.
Similarity score 0.997 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000278972
MTBE and chlorodifluoromethane discharge data for WTC sump/dewatering, Jan–Feb 2002.
Similar indexed content
NYC-WTC_000186488
Summary table of water quality monitoring data for MTBE levels at the World Trade Center sumping and dewatering site from December 2001 through July 2002.
Similar indexed content
NYC-WTC_000388641
MTBE and related contaminants across labs for sump and dewatering discharge, May 2002.
Similar indexed content
NYC-WTC_000330640
Discharge sample results for MTBE and chlorodifluoromethane across dates.
Similar indexed content
NYC-WTC_000202794
Log of MTBE concentration measurements in water samples from the World Trade Center sumping and dewatering project over a six-month period.
Similar indexed content