NYC 9/11 Public Portal Document
ATC/^MutS, Air Sampling Data For 04/05/02 to 04/12/02
WTC Recovery Project
Begin Shin Adj. % Shin Adj
Sample ID Zone Job Description Time End Time Worker Respirator Analyte Results oeU OEL^ % oel’ del’
WTC-TU-RF-M- torch cutter V\n'C 5, B2 4/6/2002 4/6/2002 3:05:00 <0.00014
020406-02 TU torching rebars, beams 7:55:00 AM PM Pollydore Littleton 1/2 NPR Nickel mg/cum 1.5 0.72
WTC-TU-RF-M- torch cutter WTC 5, B2 4/6/2002 4/6/2002 3:05:00 <0.0026 mg/cu
020406-02 TU torching rebars, beams 7:55:00 AM PM Pollydore Littleton 1/2 NPR Selenium m 0.2 0.134
WTC-TU-RF-M- torch cutter WTC 5, B2 4/6/2002 4/6/2002 3:05:00 <0.0026 mg/cu
020406-02 TU torching rebars, beams 7:55:00 AM PM Pollydore Littleton 1/2 NPR Thallium m 0.1 0.048
WTC-TU-RF-M- torch cutter WTC 5, B2 4/6/2002 4/6/2002 3:05:00 <0.0028 mg/cu
020406-02 TU torching rebars, beams 7:55:00 AM PM Pollydore Littleton 1/2 NPR Tin m 2 0.96
WTC-TU-RF-M- torch cutter WTC 5, B2 4/6/2002 4/6/2002 3:05:00 <0.00044
020406-02 TU torching rebars, beams 7:55:00 AM PM Pollydore Littleton 1/2 NPR Vanadium mg/cu m 0.05 0.05
O
K
I
o
o
I
o
o ’•OEL=Occupational Exposure Limit, the lower of the OSHA PEL or ACGIH TLV.
2.,
Shift Adj. OEL=OEL lov/ered when appropriate to reflect 12 hour x 7 day a week shifts.
cn
3-1When the result is not quantifiable a % OEL is not calculated.
Page 39
co
it-
NYC-WTC_000280552
OCR can misread numbers and units. Confirm readings against the page image before using them.