Page image not rendered yet. The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text
OCR status: ok · source: pdftotext
NYC 9/11 Public Portal Document
1
5
1
HART fixed route cost recovery declining by an
annualized rate of 1.5 percent ranging front 1 7.5 to I 5.S
percent over this period. HART Paratransit cost
recovery improved at an annualized rate of 11.4
percent, ranging front 3.5 to 5.9 percent over the
1 period.
1
A
4
111-56
NYC-WTC_000279462
OCR can misread numbers and units. Confirm readings against the page image before using them.
NYC-WTC_000279462Source: NYC Law Department, mirrored locally