NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 414 pages

Ground Zero environmental health schools report

Machine-extracted title · confidence 45%

Document discussing lessons learned in children's environmental health related to Ground Zero sites.

NYC-WTC_000276036–000276449
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

N V I RON

October 26, 2001

MEMORANDUM

To: Ahsan Farooqi

From: Thomas Fusillo Jeffrey Entin

Subject: Summary of PS 234 Outdoor Issues

During a visit to the PS 234 site by ENVIRON representatives on Thursday, October 18, observations were made concerning the status of the scliool cleanup in certain areas following the events of September 11. During ENVIRON '.s second visit to the site on October 22, 2001, these areas were identified and brought to the attention of New York Board of Education representative Bernard Orlan, Construction official Alex Lampert, and several Board of Education contractors' representatives. For each item, ENVIRON’s suggested mitigation measures follow.

The following is not intended to be a comprehensive list of issues or concerns but merely identifies cleanup items that appear unfinished. ENVIRON’s suggestions shall not be construed as contractor specifications. All work should be performed in accordance with applicable laws, regulations and permits:

Roof An accumulation of dust and debris (including visible fiberglass insulation and small pieces of wallboard) was observed berween and beneath the layer of stone across the entire school roof. This dust and debris is of the same appearance as the dust and debris that covered the area after September 11 and more than likely contains asbestos. The dust was extremely dry and friable and would be easily entrained in the roof air intakes or blown off the roof into the play areas during windy conditions. The dust is also in proximity to roof drains, suggesting the potential to impact surface waters. While there has been significant removal of debris from the roof, it is evident that the roof cleanup is incomplete.

I i C.i> ill.'. . riiinvluii, Nca- Icrsey H S >'11) • (..! S • I'SA . T, I (1.0") q 2 -'HI IK) I'.,!.: tbO',’ ) -J-,2-0’;:4 www.enviroucorp.com

CITY_21MC1OO_O12173124

NYC-WTC_000276279

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000276279Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000106411 · Box DEP Box 37

Union memorandum regarding environmental monitoring and cleanup protocols following the closure of Stuyvesant High School after the September 11 attacks.

Similar indexed content

NYC-WTC_000149798 · Box DEP Box 10

Generic form or header page from the Department of Environmental Protection regarding general World Trade Center notices and requests.

Similar indexed content

Compare copies and versions →