NYC 9/11 Public Portal Document
TASSOCIATES
hacher
form (Attachment 10). Proper Chain-of-Custody records are crucial to sample
tracking, reflects that the collected samples were handled by authorized personnel and
supports the integrity of sample anafolical results.
Mr. Vladimir Nikolaev is listed on Chain of Custody as the technician who collected
samples on 10/31/01. TA found no evidence that the samples were ever relinquished
by Mr. Nikolaev, or who handled the samples between 10/31/01 and 1 l/08/(no year
indicated). Furthermore, TA found no evidence that Mr. Nikolaev was present at the
site on 10/31/01 (Attachment 11).
TA also identified a discrepancy between technical field services invoiced to the
project and signatures on the Chain of Custody records. On September 25 and
September 26 Mr. Johnny Valencia’s signature appears as the technician collecting
bulk and air samples. However, Mr. Valencia’s presence at the site is not reflected on
the invoice or any other documentation provided to TA for analysis (Attachment 12).
d) Proper bulk sampling procedure does not require the submission of blank sample(s).
TA’s examination identified data forms for bulk sampling w'hich included field
blanks. In addition, the same forms had no indication of where the samples were
collected, thus negating the usefulness of the samples (Attachment 13).
Billing Issues
a) There is an overstaffing of technicians assigned to the work. With some exceptions,
most “Air Sample Record and Chain of Custody” forms list two (2) technicians.
Where single technicians are listed, the amount of field samples collected is the same
as when two (2) technicians are utilized (Attachment 14). The industry standard for
the sampling work would require only one (1) technician to perform the work. A
comparison with another firm on randomly selected days for labor for samples
collected, (for the same type of samples) indicates that the sample collections were
made with half the labor force of PT&L’s sub-contractor. Omega, or one (1)
Technician collecting basically the same amount of samples. The over charge for the
extra technicians was determined by TA to be $53,400.00. (Attachment 15)
b) TA identified over billing by PT&L for overhead and profit for services provided by
its subcontractors. PT&L invoiced the overhead and profit at a rate of 21% as
opposed to 5% for “other tier” contractors. PT&L over billing resulted in a potential
overcharge of $23,585.01.
c) A review of the Air Sample and Chain of Custody forms indicate excessive “Field
Blank” anfo'or “Lot Blank” samples. Submission of blank field and lot samples were
established for the purpose of quality assurance/control. The minimum requirements
or recommendations to submit blank samples adequately demonstrate the conditions
of the medium prior to sampling. Excessive field blank and lot blank submissions
inflate the cost of laboratory' analytical sen-'ices. Due to the volume of material and
discrepancies identified within the support documentation provided, TA did not
6
CITY_21MC1OO_O119O631O
NYC-WTC_000269247
OCR can misread numbers and units. Confirm readings against the page image before using them.