NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

Federal EMA project worksheet narrative

Machine-extracted title · confidence 31%

FEMA project worksheet narrative for asbestos sampling in school building and costs.

NYC-WTC_000266215–000266216
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Polychlorinated Biphenyls (VOCs) H.A. Bader used a direct reading portable Photo Ionization Detector (PID Volatile Organic Compounds (VOCs)) to measure levels of VOCs (which includes benzene) throughout the building. Readings were also taken outdoors. The Mini-RAE PID is used for the measurement of most VOCs, down to a level of 0.1 ppm (parts per million). The sensor consists of a sealed UV light source that emits photons, which are energetic enough to ionize many trace spaces (particularly organics). The total cost for this testing is $ 5,721.00

Fine Dust Particles Testing (PM2.5) H.A Bader took real-time particle (aerosol) measurement in ug/m3 at 2.5 um diameters (PM) using a TSI Model 8520 Dust Trak Aerosol Monitor throughout the building. Readings were also taken outdoors. TSI Dusk Trak is a portable instrument that allowed sampling throughout the inspected floors. Gravimetric samplers are larger instruments, which are normally fixed. Because of the amount of dust in the building and the ongoing construction activities, the elevated particulate levels measured can be expected. Appropriate respiratory protection (HEPA) should be worn by all personnel entering the building. The total cost for this testing is $ 5,721.00

Summary of Costs:

H.A Bader completed 100% of the work CUNY contracted to perform, at the present time CUNY awaiting on additional reports from H.A Bader.

Asbestos Sampling

Dioxin Heavy Metals Polychlorinated Biphenyls (PCBs) Polychlorinated Biphenyls (VOCs) Fine Dust Particles Testing TOTAL

$7,624.96 $ 18,971.00 $11,541.00 $6,661.00 $5,721.00 $5,721.00 $58,090.00

Prepared By Rudolph Griffith, Project Officer FEM A Form 90-91 (BACK), Sep 98

CITY_21MC100_001850223 NYC-WTC_000266216

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000266216Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

NYC-WTC_000243532

EIA report for 100 Church Street preparation by TRC Engineers.

Similar indexed content

NYC-WTC_000243565

EIA report for Law Department project at 100 Church Street by TRC.

Similar indexed content

Compare copies and versions →