3. Wipe samples shall be collected before and after cleaning for lead, mercury, dioxin, and PAHs.
Prior to the cleaning activities, three wipe samples shall be collected for each of these parameters in each apartment. The sampling locations shall be a wall, a bare floor, and a counter or tabletop.
After cleaning activities, three wipe samples shall be collected for each of these parameters in each apartment. The sampling locations shall be a wall, a bare floor, and a counter or tabletop; preferably at the same location as the pre-cleaning samples.
4. The required sampling and analytical procedures are specified in Table 1.
Table 1: Sampling and Analytical Methods Parameter Description Sampling Methodology Analytical Method_______ Lead Wipe samples HUD Appendix 13.1 EPA Method SW-846-6010B PAHs Wipe samples ASTM D6661-01 ASTM-6661-01 EPA SW-846-8270C Dioxin Wipe samples ASTM 6661-01 ASTM 6661-01 EPA Method SW-846-8290 Fibrous Glass Air samples NIOSH 7400 NIOSH 7400, Counting Method “B” Crystalline Silica Air samples NIOSH 7500 NIOSH 7500 (XRD) Mercury Wipe samples HUD Appendix 13.1 EPA Method SW-846 7471A
Asbestos Air Sample Collection and Analysis
1. All asbestos air samples collected during clean-up activities shall be analyzed via TEM. The method of analysis and sampling methodologies shall be in accordance with the applicable sections of Title 15, Chapter 1 of the Rules of the City of New York, and AHERA.
2. A turnaround time of 24 hours is required for all samples.
3. Asbestos clearance air samples shall be analyzed in accordance with the NIOSH 7400 Method, and analyzed by PCM followed by TEM. The laboratory shall report a PCMe value of all fibers greater than 5 microns in length. Therefore, the lab shall report PCM, TEM and PCMe values for each sample.
Asbestos Air Monitoring
1. Ata minimum, five (5) TEM samples shall be collected per day during cleanup activities.
2. Samples shall be collected at isolation barriers outside the work area, the clean room of the worker/waste decontamination facility, and outside of the building.
3. Sample collection during clean up activities shall be in accordance with Title 15, Chapter 1 of the Rules of the City of New York (RCNY) and AHERA regarding documentation, sample locations, rate of flow, and required volumes to achieve the necessary analytical sensitivity.
3 of 5
CITY_21MC100_009369646
NYC-WTC_000265739
OCR can misread numbers and units. Confirm readings against the page image before using them.
Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.
NYC-WTC_000302737
Chain of custody for 125 Cedar Street project; cleaning by abatement contractor and monitoring required.
16 shared non-person entities · 1 shared topics · similarity 0.975
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000282507
Draft scope detailing on-site air monitoring and clearance sampling requirements.
14 shared non-person entities · 1 shared topics · similarity 0.974
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000307885
Mandatory pre-bid for 125 Cedar Street WTC cleanup; overview of asbestos sampling and monitoring.
14 shared non-person entities · 1 shared topics · similarity 0.967
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107365
Document outlining the scope of work for environmental sampling, air monitoring, and asbestos abatement at 125 Cedar Street.
16 shared non-person entities · similarity 0.995
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000108786
A document listing seven licensed contractors authorized to perform clean-up and abatement work at the World Trade Center site.
16 shared non-person entities · similarity 0.977
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000107194
Notice of mandatory pre-bid meeting and scope of work for interior cleaning and environmental monitoring at 125 Cedar Street.
16 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000100879
Permit document detailing the installation of a heavy-duty shed and facade repairs at 114 Liberty Street in May 2002.
14 shared non-person entities · 1 shared topics · similarity 0.976
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000160622
Internal review request for FEMA mission assignment proposal.
6 shared non-person entities · similarity 0.969
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000141536
Request outlining DEP procurement and EPA supervision of cleaning and sampling contracts for Lower Manhattan residents.
5 shared non-person entities · similarity 0.968
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000160896
Inquiry regarding an asbestos addendum and scope of work document circulated by the EPA for World Trade Center cleanup.
6 shared non-person entities · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000152149
A fax cover sheet from the Department of Environmental Protection dated September 19, 2001.
6 shared non-person entities · similarity 0.965
machine-extracted · confidence unavailable · Check page ↗7 shared non-person entities · similarity 0.963
machine-extracted · confidence unavailable · Check page ↗Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.
NYC-WTC_000220321
DEP Bureau document defining scope for environmental sampling and asbestos air monitoring during interior cleaning at 125 Cedar Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000307895
Table of sampling methods for lead, PAHs, dioxin wipe samples; HUD/EPA methods listed.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000163439
Document recording the chain of custody for environmental monitoring samples collected at 125 Cedar Street in October 2002.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000252321
Chain of custody/SC for 125 Cedar Street cleaning and asbestos monitoring scope.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000284068
DEP scope of work for asbestos abatement monitoring and contractor oversight at 125 Cedar Street.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗NYC-WTC_000156019
Document tracking the chain of custody for environmental samples collected at 125 Cedar Street on August 21, 2002.
Similarity score 1.000 (not a probability)
machine-extracted · confidence unavailable · Check page ↗Machine-extracted building matches; verify each source. Buildings, never households.
Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.
NYC-WTC_000107365
Document outlining the scope of work for environmental sampling, air monitoring, and asbestos abatement at 125 Cedar Street.
Similar indexed content
NYC-WTC_000108786
A document listing seven licensed contractors authorized to perform clean-up and abatement work at the World Trade Center site.
Similar indexed content
NYC-WTC_000107194
Notice of mandatory pre-bid meeting and scope of work for interior cleaning and environmental monitoring at 125 Cedar Street.
Similar indexed content
NYC-WTC_000100879
Permit document detailing the installation of a heavy-duty shed and facade repairs at 114 Liberty Street in May 2002.
Similar indexed content
NYC-WTC_000302737
Chain of custody for 125 Cedar Street project; cleaning by abatement contractor and monitoring required.
Similar indexed content