NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 2 pages

Asbestos/ABF permit notification, PS 89M

Machine-extracted title · confidence 42%

Asbestos project notification and AHERA inspection report for PS 89M, 201 Warren Street.

NYC-WTC_000252335–000252336
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

^ESTOS INSPECTION REPORT (continued)

2LjAsb0stos Hauler DJM Company, Inc. NYS DEC Permit # NJ344 Tel,# DisDoaalSrtefsl GreenridKe Reclamation Landfill

27. This asbestos abatement is part of a (Item a through e requires filing of this form with NYC Department of Buildings) a) □ Demolition b) □ Boiler Replacement c) □ Sprinkler Replacement d) □ RonovaUon/Altoralion e) D Fireproofing Replacement f) Q Other (Describe) WTC Attack Directive________________________

28. TYPE OF ABATEMENT (Check all appropriate boxes) D Removal □ Enclosure Cl Encapsulation Cl Repair 0 Qeanup

29, ABATEMENT PROCEDURE (Check ell appropriate boxes) O Fill Containment □ Glovebag □ Tent □ DEP Variance Application TxT Other - Directive

30, LOCATIONS OF ABATEMENT DESCRIBE SECTION AFFECTED SURFACES AMOUNT OF ACM I DESCRIPTION OF WORK BEING Rooits) OF FLOOR CONTAINING ACM PERFORMED (0.5. enOn, eul wing, non A (0.3. Hpe tagging, casing, plenum SQUARE LINEAR (e.g. iwung cable, inataftng firn iprinWera. baler room, lobby; etc) ducts, storage tanka, deddno.eto.) FEET FEET •eefnrtuirtrt 1W1 T

ieaent All Dust Cleanup 1st Entire All ^.320 Dust Cleanup Enti All Dii-gt Clp^nup

3rd Entire A11 1.370 nit«;r n tp. 4th Entire Al 1 4.390 Dn^r nipanim •irh Entire Al 1 370 Di ist" mpflntip

31, I hereby declare that the intormation provided herein is true and complete to the best of rpy knowledge, I am familiar with Federal, State and NYC laws and regulations applicable to asbestos related work.

HiLlmann Environmental AEi2, LLC AE12, LLC Mama of Air Monitor PiWNamo -------Print Name of AsbattoaCorinid^ ^w.-^rW^tacnear>ppfkant(e<j(her1hmO^

Signaua

Date

3Z I understand that as the owner of a building where asbestos abatement activity occurs, I am responsible tor the performanoe of the asbestos abatement activities in accordance with the Program Rules. I have contracted the third party air monitor who is completely independent of all parties invol asl ps ^ecL I hereby deciare that I have auth^zod the filing of this notification for the work specified herein, Essa Batch Print Name or Owner

A STAMPED COPY OF THIS FORM INCLUDING AM ENTS MUST BE AVAILABLE AT THE WORK SITE.

I Any modification of infomiation provided on this form must be reported immediately in writing directly to the NYC PEP ACP. I The requirements of the Asbestos Control Program Rules may not be lawfully avoided or lessened through the performance of work in incremental or piecemeal fashion.| ACF7 2/2001

NYC-WTC_000252336

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000252336Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

No available related records indexed in this group.

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →