NYC 9/11 Public Portal Document
then be wet-wiped with amended water containing a non-sudsing surfactant. No surface
should be dry swept or dusted because this will re-entrain the dust. Upholstery and
carpets should be HEPA-vacuumed and cleaned using either steam or a hot-water
extraction method (Kominsky et. al, 1990). All clothing, linens, and other similar items
should be laundered.
4) The heating, ventilation, and air-conditioning (HVAC) system should be inspected. If
the system was in operation during or after the September 11* incident, it may contain
asbestos-contaminated dust. An environmental consultant should be consulted to
determine the most efficient procedures to clean the system including the air-handling
unit and ventilation ducts (supply and return).
5) A suitable re-occupancy clearance criterion needs to be established. This criterion can
be based on a thorough visual inspection and/or air testing.
6) To prevent or minimize the outdoor dust from entering the apartment: (1) keep windows
closed and repair all broken glass; (2) set the air-conditioner to re-circulate air (closed
vents), change the filter initially and frequently thereafter; and (3) remove shoes before
entering the apartment.
42
CONFIDENTIAL INSURANCE INFORMATION, CITY_2IMCl00_011803652
SUBJECT TO PROTECTIVE ORDER NO, 2, SEPT, 2008
NYC-WTC_000250980
OCR can misread numbers and units. Confirm readings against the page image before using them.