NYC Law Department release
Independent mirror · updated as the City releases more · v1.5.1
☕ Buy me a coffee
← Document results/Unboxed/No folder label
Document / 4 pages

Project monitor log, abatement, 115 Broadway

Machine-extracted title · confidence 50%

Project monitor log for abatement at 115 Broadway, with phase and contractor details.

NYC-WTC_000247542–000247545
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

PROJECT MONITOR LOG Part 2

I.Ciient: 2. Project Name: 3. Project Address: 4, Project #: 5. Date:

- <7 <7 J— PREP-INSPECTION CHECKLIST: Work Area Location: Pan Fail N/A Pan Fail N/A 1. Vacated by occupants. 8 Openings <32lt' covered by 2 lyrs poly. 2. Warning Signs (Eng, Sp). 9 Openings >32ft’ covered by plywood and two layers of poly. 3. Electricity down/locked out. 4. Power outside work area with GFI. 10. Movable objects pre-cleaned, removed from area. 5. HVAC off, locked-out, isolated, or pressurized. 11. Fixed objects pre-cleaned, plasticized. 6 DECONTAMINATION UNIT: 12. Floor poly 6" onto walls (12' =NYS). 13. Wall poly to the floor. • Outside work area • CIn, shwr, eqpt rooms 14. 6” overlap between adjacent sheets of poly. • 2 layers, 6-mil wall poly 15. Elevator bypasses work area. • 2 layers, 6-mil floor poly 16. Plywood/poly barrier before elevator • 1 shower per 6 workers doors. • Hot/cold waler 17. Perimeter diaphragm for elevator • Waste water < 5 microns barrier. • Waste water sewer/drum 18. 4 air changes per hour from negative air unit. • Soap/Shampoo 19. New filters in negative air units. * Disposable towels 20. Negative air pressure ^.02 • Waste bags 21. Minimum 2 means of exiting work area. POSTINGS; 22. Toilet for abatement personnel. • Regulations (NYC, NYS, OSHA, EPA) 23. Waste Decon for >1,000 ft. ACM • Sign-in logs 24. The following additional equipment; • Evacuation Pian • 6-mil disposable bags with warning labels • Supervisor's license • Poly and Duct Tape • Worker licenses • Fire extinguisher • ACP-7 • Approved respirator • Building Permit/Placard • Replacement filters • EPA 10-day notification • Protective Clothing • NYS Notification 25. Work Area pre-cleaned * Emergency Numbers 26. Work Area passes inspection .Yes .No * Material Data Sheets PRE-ENCAPSULATION/FINAL INSPECTION CHECKLIST: Work Ana Location: Pm Flil N/A Pm Fill N/A 1. No visible debris on walls, floors. 8. Nd bags of waste in work area. 2. No visible debris between decking 9. All equipment clean. and beams. W Neg. Air 2 0.02 inch, of water. 3 No visible debris behind perimeter columns. 1 T.^Akless spray equipment used. 4. No visible debris on top of ducts. 12. Wi js dry, free of water pools. 5. No visible debris on hangers, rods, 13. The area suitable for encapsulation. lights. 14. The area suitable for final air clearance. 6. No visible debris on poly. 15. Work Area passes inspection .Yes ___ No (Explain why) 7. No visible debris on pipes.

Form NY-9

CONFIDENTIAL, CITY_21MC100_003446106 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000247544

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000247544Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

No available related records indexed in this group.

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Compare copies and versions →