Final report, Warren & Panzer Engineers, 2004

Machine-extracted title · confidence 41%

Final report for project N/A, prepared by Warren & Panzer Engineers; confidential info.

NYC-WTC_000247380–000247450
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Warren & Panzer Engineers, P.C. City of New York - Department of Design and Construction Peck Slip, Manhattan

c 1.0 INTRODUCTION

1.1 Background Information At the request of the City of New York Department of Design and Construction (DDC), Warren & Panzer Engineers, P.C. (Warren & Panzer) performed a Limited Subsurface Corridor Investigation at the Peck Slip Corridor, in the South Street Seaport Section of the Borough of Manhattan, New York. The Corridor includes the following Right-of-Ways: • Peck Slip between Pearl Street and South Street • Beekman Street between Water Street and South Street • Water Street between Beekman Street and Dover Street; and Front Street between Beekman Street and Dover Street. The investigation was conducted to determine if the site’s environmental condition might impact the proposed sanitary sewer replacement activities.

c 1.2 Scope of Work At the request of the DDC, a site visit was performed on July 28*, 2004. Greg Cellamare of Warren & Panzer performed the fieldwork on August 26* and 27*, 2004. Aquifer Drilling And Testing, Inc. performed the drilling activities. The investigation consisted of:

• Reviewing the construction drawings for scoping the Subsurface Investigation and preparation of a Work Plan.

August 26*, 2004: • Oversight of the utility clearance of ENV-1, EN V-2 and EN V-3 to a depth of five feet below grade, utilizing a vactron machine.

August 27*, 2004 • Continuation of the utility clearance of ENV-4 to a depth of five feet below grade, utilizing a vactron machine.

c Warren & Panzer Project ID No. 1208.43.01 FINAL- September 30, 2004 DDC CAPIS ID No. HWM1159/HWMWTCA7D ” Work Order Letter No, 1355-W&P2R-1455

CONFIDENTIAL INSURANCE INFORMATION, CITY_21MC100_008634562 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000247387

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000247387Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Semivolatile PAH testing, 2002

NYC-WTC_000337971

Laboratory report listing PAH compounds and concentrations from WTC site samples.