Final report, Warren & Panzer Engineers, 2004

Machine-extracted title · confidence 41%

Final report for project N/A, prepared by Warren & Panzer Engineers; confidential info.

NYC-WTC_000247380–000247450
Page image
Page image not rendered yet.
The pipeline renders page images incrementally; check back or read the OCR text alongside.
OCR text

OCR status: ok · source: pdftotext

NYC 9/11 Public Portal Document

Warren & Panzer Engineers, P.C. City of New York - Department of Design and Construction Peck Slip, Manhattan

c EXECUTIVE SUMMARY

At the request of the City of New York Department of Design and Construction (DDC), Warren & Panzer Engineers, P.C. (Warren & Panzer) performed a Limited Subsurface Corridor Investigation at the Peck Slip Corridor, in the South Street Seaport Section of the Borough of Manhattan, New York. The Corridor includes the following Right-of-Ways: • Peck Slip between Pearl Street and South Street • Beekman Street between Water Street and South Street • Water Street between Beekman Street and Dover Street; and Front Street between Beekman Street and Dover Street. The investigation was conducted to determine if the site’s environmental condition might impact the proposed sanitary sewer replacement activities. Warren and Panzer performed the investigation, which consisted of:

c • Reviewing the construction drawings for scoping the Subsurface Investigation and preparation of a Work Plan.

August 26*, 2004: • Oversight of the utility clearance of ENV-1, ENV-2 and ENV-3 to a depth of five feet below grade, utilizing a vactron machine.

August 27*, 2004 • Continuation of the utility clearance of ENV-4 to a depth of five feet below grade, utilizing a vactron machine. • Advancement of three soil borings in the overburden, using direct-push Geoprobe drilling equipment, to a maximum depth of 16 feet below ground surface (bgs) or the water table, whichever occurs first. Included were the collection of a grab soil sample fi-om each boring, and the collection of one groundwater sample using a temporarily installed well point. One site-composite soil sample was prepared by mixing the grab samples taken fi-om each boring; c Warren & Panzer Project ID No. 1208.43.01 FINAL- September 30, 2004 DDC CAPIS ID No. HWM1159/HWMWTCA7D Work Order Letter No. 1355-W&P2R-1455

CONFIDENTIAL INSURANCE INFORMATION, CITY_2IMCl00_008634557 SUBJECT TO PROTECTIVE ORDER NO. 2, SEPT. 2008

NYC-WTC_000247382

OCR can misread numbers and units. Confirm readings against the page image before using them.

NYC-WTC_000247382Source: NYC Law Department, mirrored locally

Related records

Browse subjects →

Ranked by indexed similarity. Reasons describe shared subjects and filing context; check the source records.

Same-box records

Filed elsewhere

More like this page

Similar subjects in other documents. Similarity does not establish the same event, measurement or conclusion.

Buildings in this record

Machine-extracted building matches; verify each source. Buildings, never households.

Others also read

Readers open these alongside this record — through an Ask answer, the same folder, or indexed similarity. Not a claim they are about the same event.

Semivolatile PAH testing, 2002

NYC-WTC_000337971

Laboratory report listing PAH compounds and concentrations from WTC site samples.